23 Sunset Blvd
Houston, TX 77005 · Rice University
Rice University Jones North residential college renovation
Rice University registered an interior renovation of level 1 and the basement of Jones North, a residential college, on March 6, 2024. The TDLR registration lists 3,250 square feet and an applicant-estimated project cost of $850,000; student rooms on levels 2 through 4 are excluded from the scope.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 6, 2024
- since Mar 6, 2024
- Largest scope
- 3,250 sf
- Estimated cost
- $850K
- state registration
Where this project stands
CompletedRice University - Jones North Renovation
3,250 sq ft · $850K est.
- RegisteredMar 6, 2024
- Plan review
- ConstructionMay '24 – Aug '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior renovation of level 1 and basement of a residential college at rice university. student rooms on levels 2 through 4 area excluded from the scope. — jones north
TDLR project registrationRenovation/AlterationProject Closed3,250 sq ft$850K est.- Project #
- TABS2024013169
- Tenant / owner
- Rice University - Jones North Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 23 Sunset Blvd
What is being renovated at 23 Sunset Blvd?
Rice University’s Jones North residential college is getting an interior renovation of level 1 and the basement. The TDLR registration, filed March 6, 2024, is TABS2024013169.
When was the Jones North renovation registered?
The TDLR project registration was filed on March 6, 2024. Its listed status is Project Closed.
Are the student rooms at Jones North included in the renovation?
No. The registration says student rooms on levels 2 through 4 are excluded from the renovation scope.
How large is the Jones North renovation?
The TDLR record lists a project area of 3,250 square feet.
What is the estimated cost of the Jones North renovation?
The applicant’s estimate in the TDLR registration is $850,000.
What is being renovated near Rice University on Sunset Boulevard?
At 23 Sunset Blvd, Rice University registered an interior renovation of Jones North’s level 1 and basement on March 6, 2024. The project record is TABS2024013169.
Also being built nearby
All of 77005- 14 Remington LnFeb 25, 2025Residential new solar panel · 57 m away
- 16 Sunset BlvdApr 17, 2024Residential repair per speclist · 94 m away
- 9 Sunset Blvd · Rice UniversityMar 6, 2024Rice university - brown renovation — renovation/alteration — interior renovation of level 1 and basement of a residential college at rice university. student rooms on levels 2 through 8 area excluded from the scope · 138 m away
- 10 Remington LnMay 9, 2018(epr) s.f. residential structural steel superstructure · 172 m away
- 9 Remington LnJun 8, 2018Residential outdoor / kitchen living area · 172 m away
- 2 Sunset Blvd · Rice UniversityJul 21, 2025Residential cmu fence addition · 178 m away
- 22 Sunset BlvdOct 28, 2024Minor residential repairs, single family residential · 184 m away
- 1500 Sunset Boulevard · Congregation Emanu ElMar 16, 2026Kitchen renovation at the existing temple building — renovation/alteration — renovation of the existing commercial kitchen at the existing temple building, which includes updating cabinetry, finishes, and replacing food service equipment · 203 m away
- 26 Sunset BlvdJun 26, 2017Residential repair as per spec list · 207 m away
- 6100 Main Street · Dell Butcher HallOct 30, 2026Dr. reece lab - dell butcher hall 120 — renovation/alteration — the project consists of the renovation of approximately 1,324 sq ft of existing laboratory space. the scope includes selective demolition, installation of new laboratory casework, modifications to mep systems to support operations, and new finishes · 222 m away
- 6100 Main Street - Rice University Campus · Rice UniversityFeb 23, 2024Rice biosciences labs — renovation/alteration — non-structural interior renovations to existing laboratories in the basement, second level, and third level. limited demolition of interior partitions. new partitions, doors, finishes, and ceilings. no change to current occupancies · 222 m away
- 6100 Main St Bld3Nov 27, 2018(epr)19,820 sq ft university remodel '12 ib c 100% · 222 m away