1550 Lamar St
Houston, TX 77010 · Q-TX LLC, Third Coast Midstream + 5 more
Office buildouts permitted at 1550 Lamar Street
Permits indicate office buildouts in multiple tenant suites at 1550 Lamar Street, an existing multi-tenant building. The latest listed City of Houston permit, dated April 15, 2026, covers a 13,834-square-foot high-rise office buildout; other office buildouts were permitted in March 2026.
Summarized from City of Houston, Texas Department of Licensing and Regulation records · updated Apr 15, 2026
- Projects
- 27
- 47 filings
- Latest filing
- Apr 15, 2026
- since Jun 7, 2021
- Largest scope
- 676,682 sf
- Estimated cost
- $20M
- state registration
Where this project stands
Certificate of occupancy issued13,834 sq ft hi rise office buildout
- Building permitSep 22, 2025
- Trade permitsAug 18, 2025
- OccupancySep 22, 2025
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 2 phone numbers
Permit & project history
27 projectsNew office build-out, level 18 — norton rose fulbright tower
TDLR project registrationNew ConstructionInspection Complete16,738 sq ft$4.3M est.- Project #
- TABS2026008675
- Tenant / owner
- Norton Rose Fulbright Lvl. 18
- Design firm
- Pro
- Contact
- Pro
New build out on "broom swept" floors (lvl's 20 - 26) in new core & shell building; class a; new one story stair; includes catering pantry — 1550 on the green
TDLR project registrationNew ConstructionProject Closed99,042 sq ft$20M est.- Project #
- TABS2023017769
- Tenant / owner
- Norton Rose Fulbright
- Design firm
- Pro
- Contact
- Pro
Sources: City of Houston · Texas Department of Licensing and Regulation
Questions about 1550 Lamar St
What is being built at 1550 Lamar Street?
Permit records show office buildouts in multiple tenant suites at the existing multi-tenant building. The latest listed permit, No. 25077683, was filed April 15, 2026, for a 13,834-square-foot high-rise office buildout.
Is 1550 Lamar Street a new office building?
The records describe office buildouts and alterations inside a high-rise, rather than a new office building. Multiple tenant suites have had permits filed for work.
What companies have office buildout permits at 1550 Lamar?
Records list office buildouts associated with Q-TX LLC, Third Coast Midstream, Norton Rose Fulbright, Hicks Johnson, and Boston Consulting Group. The address is a multi-tenant building, so the permits do not indicate that one company occupies the entire property.
What was the latest permit for 1550 Lamar Street?
The latest listed City of Houston permit is No. 25077683, dated April 15, 2026. Its description is a 13,834-square-foot high-rise office buildout.
What is being built near Third Coast at 1550 Lamar?
The records show office buildouts in multiple tenant suites at 1550 Lamar, including a 16,249-square-foot office buildout listed for Third Coast Midstream on March 26, 2026. A separate nearby filing describes a first-generation tenant-suite buildout on the 15th floor.
What is the estimated cost of the 1550 Lamar Street project?
A TDLR registration for Norton Rose Fulbright’s 16,738-square-foot Level 18 office buildout lists an applicant-estimated cost of $4.3 million. That estimate applies to the registered project, not necessarily to all work at the address.
Also being built nearby
All of 77010- 1550 Lamar St FpSep 30, 2021Hi-rise 480 sq ft fire pump room bldout sp/ (2/2)
- 1550 Lamar Street · Scd Blk 250 Houston LLCMar 3, 2025Hicks johnson — renovation/alteration — finish out of level 19 in a first generation space. scope includes offices and meeting rooms · 32 m away
- 1550 Lamar · Scd Blk 250 Houston LLCAug 11, 2025Qtx - houston — renovation/alteration — interior renovation to meet client's requirements · 32 m away
- 1550 Lamar Street, Level 15 1550 Lamar Street · Block 250Jan 16, 2026Third coast — renovation/alteration — first generation interior build-out of a new tenant suite in an existing building with multi-tenant floors, located on 15th floor · 32 m away
- 1600 Lamar Street · Houston First CorporationMar 18, 2025South garage/hilton skybridge demolition & facade alteration — renovation/alteration — the project involves demolition of the existing sky-bridge from the avenida south garage to the hilton americas hotel, new building envelope infill, and minor interior reconfiguration. 1,280 sq ft · 42 m away
- 1400 Mckinney St · Park One PlaceApr 7, 2026Demolition of interior non-load bearing non-fire rated walls · 148 m away
- 1500 Mckinney StJul 17, 2019(epr) new playground equip. and site improvements · 152 m away
- 1501 Mckinney StAug 2, 20182341 sq ft hi-rise office remodel 100% · 164 m away
- 1501 Mckinney St Lv 6Jan 28, 2019(epr) 3,220 sq ft hi-rise ofc remodel 100% · 164 m away
- 1510 Polk St BsmtJul 24, 2018(epr) stadium (club area) remodel 100% · 166 m away
- 1510 Polk Street · Harris - Houston Sports AuthorityDec 16, 2025Toyota center suite renovation — renovation/alteration — a remodel of all the suites on the 2 suite levels of the arena with new finishes also in the suite corridors and restrooms · 166 m away
- 1600 Lamar StNov 25, 2025Hotel remodel - (2/2) · 169 m away
More demolitions in 77010, gas stations & car washes in 77010, offices in 77010.