1600 Lamar Street
Houston, TX 77010 · Houston First Corporation
Hilton Americas skybridge demolition and facade work
A project at the Hilton Americas Houston calls for demolishing the existing skybridge between the hotel and the Avenida South Garage, infilling the building envelope and making minor interior changes. The TDLR project registration was filed on March 18, 2025, and lists 1,280 square feet of work. The applicant’s estimated project cost is $525,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 18, 2025
- since Mar 18, 2025
- Largest scope
- 1,280 sf
- Estimated cost
- $525K
- state registration
Where this project stands
Finishing up · inspection nextSouth Garage/Hilton Skybridge Demo & Facade Alteration
1,280 sq ft · $525K est.
- RegisteredMar 18, 2025
- Plan review
- ConstructionJul '26 – Oct '26
- Inspectednow
- Closed
Scheduled to finish Oct 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project involves demolition of the existing sky-bridge from the avenida south garage to the hilton americas hotel, new building envelope infill, and minor interior reconfiguration. 1,280 sq ft — hilton americas houston
TDLR project registrationRenovation/AlterationReview Complete1,280 sq ft$525K est.- Project #
- TABS2025014491
- Tenant / owner
- South Garage/Hilton Skybridge Demo & Facade Alteration
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1600 Lamar Street
What is being built at 1600 Lamar Street?
The registered work involves demolishing the existing skybridge between the Avenida South Garage and the Hilton Americas Houston, adding building-envelope infill and making minor interior changes. It is listed as a renovation or alteration, not a new building.
When was the Hilton Americas skybridge project filed?
The TDLR registration was filed on March 18, 2025. The project number is TABS2025014491.
Is the skybridge between the Avenida South Garage and the Hilton Americas being demolished?
The project description calls for demolition of the existing skybridge connecting the garage to the hotel, followed by building-envelope infill and minor interior reconfiguration.
How much will the Hilton Americas work cost?
The TDLR registration lists an applicant-estimated project cost of $525,000. The registered work covers 1,280 square feet.
What construction is happening near Q-TX on Lamar Street?
At 1600 Lamar Street, the Hilton Americas project registration describes skybridge demolition, building-envelope infill and minor interior changes. It was filed on March 18, 2025.
Is a new hotel being built at 1600 Lamar Street?
The record describes renovation and alteration work at the Hilton Americas Houston, not construction of a new hotel. The scope includes demolition of an existing skybridge, envelope infill and minor interior reconfiguration.
Also being built nearby
All of 77010- 1550 Lamar St · Q-TX LLCApr 15, 202613,834 sq ft hi rise office buildout · 42 m away
- 1550 Lamar St FpSep 30, 2021Hi-rise 480 sq ft fire pump room bldout sp/ (2/2) · 42 m away
- 1550 Lamar Street · Scd Blk 250 Houston LLCMar 3, 2025Hicks johnson — renovation/alteration — finish out of level 19 in a first generation space. scope includes offices and meeting rooms · 61 m away
- 1550 Lamar · Scd Blk 250 Houston LLCAug 11, 2025Qtx - houston — renovation/alteration — interior renovation to meet client's requirements · 61 m away
- 1550 Lamar Street, Level 15 1550 Lamar Street · Block 250Jan 16, 2026Third coast — renovation/alteration — first generation interior build-out of a new tenant suite in an existing building with multi-tenant floors, located on 15th floor · 61 m away
- 1600 Lamar StNov 25, 2025Hotel remodel - (2/2) · 135 m away
- 1510 Polk Street · Harris - Houston Sports AuthorityDec 16, 2025Toyota center suite renovation — renovation/alteration — a remodel of all the suites on the 2 suite levels of the arena with new finishes also in the suite corridors and restrooms · 175 m away
- 1510 Polk St BsmtJul 24, 2018(epr) stadium (club area) remodel 100% · 175 m away
- 1500 Mckinney StJul 17, 2019(epr) new playground equip. and site improvements · 176 m away
- 1400 Mckinney St · Park One PlaceApr 7, 2026Demolition of interior non-load bearing non-fire rated walls · 185 m away
- 1501 Mckinney St Lv 6Jan 28, 2019(epr) 3,220 sq ft hi-rise ofc remodel 100% · 188 m away
- 1501 Mckinney StAug 2, 20182341 sq ft hi-rise office remodel 100% · 188 m away