Recent · latest filing Oct 2025Commercial

6411 Fannin

Houston, TX 77030 · Mh Sarofim Pavilion Patient Shell Floors Buildout (bp2), Mh Sarofim Pavilion Patient Shell Floors Buildout (bp1) + 4 more

Patient-floor renovations registered at 6411 Fannin

TDLR filings indicate patient-floor buildouts and room ventilation changes at the multi-tenant site at 6411 Fannin. The filings include a Level 5 burn-unit project dated September 20, 2024, and patient-floor buildout packages dated March 4 and October 2, 2025.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 2, 2025

Projects
6
6 filings
Latest filing
Oct 2, 2025
since Sep 20, 2024
Largest scope
212,757 sf
Estimated cost
$81M
state registration

Where this project stands

Under construction

MH SAROFIM PAVILION PATIENT SHELL FLOORS BUILDOUT (BP2)

98,810 sq ft · $38M est.

  1. RegisteredOct 2, 2025
  2. Plan review
  3. ConstructionDec '25 – Dec '26
  4. Inspected
  5. Closed
90% through of a 13-month buildDec 1, 2025 → Dec 28, 2026

4 contacts on this project · 3 phone numbers

Permit & project history

6 projects
  1. Bid package 2 - shell patient floors l10-11 fitout (98,810 sq ft) — memorial hermann hospital

    TDLR project registrationRenovation/AlterationReview Complete98,810 sq ft$38M est.
    Tenant / owner
    Mh Sarofim Pavilion Patient Shell Floors Buildout (bp2)
    Design firm
    Pro
    Contact
    Pro
  2. Bid package 1 - patient shell floors buildout (212,757 sq ft) — memorial hermann hospital

    TDLR project registrationRenovation/AlterationReview Complete212,757 sq ft$81M est.
    Tenant / owner
    Mh Sarofim Pavilion Patient Shell Floors Buildout (bp1)
    Design firm
    Pro
    Contact
    Pro
  3. Convert 4 exist. iso rooms mechanical in ceiling to pos. air and 2 exist. patient rooms mechanical in ceiling to neg air. no change to exist accessibility except wardrobe closet. — memorial hermann hospital

    TDLR project registrationRenovation/AlterationInspection Complete2,600 sq ft$900K est.
    Tenant / owner
    Mh Sarofim Pavilion Level 05 Burn
    Design firm
    Pro
    Contact
    Pro
  4. Cmhh is renovating part of pediatric cardiac intense care unit located on hp level 09. scope of work includes: demolition of existing dialysis unit to be replaced by 4 new pediatric intense care patient rooms. replacement of headwall systems — children's memorial hermann

    TDLR project registrationRenovation/AlterationProject Closed29,032 sq ft$6.0M est.
    Tenant / owner
    Cmhh - Hermann Pavillion Level 9
    Design firm
    Pro
    Contact
    Pro
  5. Reno of 3 main areas: dialysis suite, infusion suite & common spaces to be shared between them. dialysis will consist of 10 open bays and 1 private isolation room along with supporting spaces like med rooms, clean & soiled rooms. 8 open bay positions — children's memorial hermann

    TDLR project registrationRenovation/AlterationProject Closed16,186 sq ft$6.3M est.
    Tenant / owner
    Cmhh - Hermann Pavillion Level 2 Cullen
    Design firm
    Pro
    Contact
    Pro
  6. Finish upgrades for holding and recovery rooms suite. addition of ir to existing shell space including finish and new equip. demolition of existing kitchen space for new mri suite. space will consist of 2 mri rooms (1.5t & 3t) along with 3 holding rooms. — children's memorial hermann

    TDLR project registrationRenovation/AlterationProject Closed11,030 sq ft$6.0M est.
    Tenant / owner
    Cmhh - Hermann Pavillion Ground Level
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 6411 Fannin

What is being built at 6411 Fannin?

TDLR filings describe renovations and buildouts of patient floors in MH Sarofim Pavilion, along with ventilation changes to existing rooms on Level 5. The records do not describe a new standalone building.

When were the patient-floor renovations at 6411 Fannin filed?

The first patient-floor buildout package was registered March 4, 2025, as TABS2025013308. A second package for Levels 10 and 11 was registered October 2, 2025, as TABS2026002399.

What does the MH Sarofim Pavilion Level 5 project include?

The September 20, 2024, TDLR filing, TABS2025001492, describes changing ventilation in four existing isolation rooms and two existing patient rooms. It lists 2,600 square feet of renovation.

How large are the patient-floor buildout projects at 6411 Fannin?

The March 2025 package lists 212,757 square feet, and the October 2025 package lists 98,810 square feet. Both are classified as renovations or alterations.

What construction is happening near Memorial Hermann Texas Medical Center?

At the same address as Memorial Hermann Texas Medical Center, TDLR records describe patient-floor buildouts in MH Sarofim Pavilion and ventilation work in existing rooms. The patient-floor packages were filed in March and October 2025.

Is 6411 Fannin getting a new hospital building?

The available TDLR filings describe renovations and alterations, not a new hospital building. They cover patient-floor buildouts and ventilation changes to existing rooms.