6411 Fannin Street
Houston, TX 77030 · Memorial Hermann Health Systems
Memorial Hermann registers CT room renovation at Jones Pavilion
A CT room on level 02 of Memorial Hermann’s Jones Pavilion is slated for equipment replacement and minor renovation, including new finishes. The project was registered with the Texas Department of Licensing and Regulation on August 4, 2026. The registration lists 450 square feet and an applicant-estimated project cost of $424,000.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2026
- since Aug 4, 2026
- Largest scope
- 450 sf
- Estimated cost
- $424K
- state registration
Where this project stands
Approved · construction starts Jul 14, 2027Memorial Hermann TMC Jones CT Renovation
450 sq ft · $424K est.
- RegisteredAug 4, 2026
- Plan review
- ConstructionJul '27 – Sep '27
- Inspected
- Closed
A 2-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectLocated on level 02 of memorial hermann tmc jones pavilion, houston, texas. the scope of the project includes the replacement of ct imaging equipment and the minor renovation of an existing ct room, including new finishes. — memorial hermann texas medical center - jones pavilion
TDLR project registrationRenovation/AlterationReview Complete450 sq ft$424K est.- Project #
- TABS2026026993
- Tenant / owner
- Memorial Hermann Tmc Jones Ct Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6411 Fannin Street
What is being built at 6411 Fannin Street?
A CT room on level 02 of Memorial Hermann’s Jones Pavilion is being renovated, with replacement CT imaging equipment and new finishes. The TDLR registration was filed August 4, 2026.
Is Memorial Hermann building a new CT room at Jones Pavilion?
The registration describes work on an existing CT room, not a new room. The scope includes replacing CT imaging equipment and minor renovation.
When was the Jones Pavilion CT renovation permitted?
The project was registered with the Texas Department of Licensing and Regulation on August 4, 2026. Its registration number is TABS2026026993.
How large is the CT renovation at 6411 Fannin?
The TDLR registration lists a project area of 450 square feet.
What is the estimated cost of the Memorial Hermann CT room renovation?
The TDLR registration lists an applicant-estimated cost of $424,000 for the project.
What's being renovated near Vasso Grill on Fannin Street?
At 6411 Fannin Street, Memorial Hermann registered a renovation of an existing CT room in Jones Pavilion. Vasso Grill is listed nearby at 6400 Fannin Street; the records do not indicate that the projects are related.
Also being built nearby
All of 77030- 6411 Fannin St Sarofim Pavilion, Level 2 · Memorial Hermann Texas Medical CenterApr 2, 2024On call rooms restroom renovation — renovation/alteration — interior renovation of an existing staff restroom to add a shower
- 6411 Fannin · Memorial Hermann Healthcare SystemOct 2, 2025Mh sarofim pavilion patient shell floors buildout (bp2) — renovation/alteration — bid package 2 - shell patient floors l10-11 fitout (98,810 sq ft)
- 6400 Fannin Street, Level 22 · Lpf Memorial Hermann Property LLCNov 17, 2025Mh transplant clinic relocation — renovation/alteration — the project includes combining and renovating three existing medical office suites into a new medical clinic. including selective demolition and renovation new finishes and meplv, and modifications · 22 m away
- 6400 Fannin Street · Lpf Memorial Hermann Property, LLCMay 11, 2026Vasso grill restaurant buildout — renovation/alteration — renovation and reconfiguration of the current restaurant space to accommodate a new concept build-out for vasso grill · 22 m away
- 6400 Fannin · Lpf Memorial Hermann Property LLCAug 16, 2024Ut physicians ct scanner — renovation/alteration — convert 2 existing rooms into a ct scanner room and control room · 22 m away
- 6400 Fannin Street, Level 29 · Lpf Memorial Hermann Property LLCMay 12, 2026Mh medical oncology relocation & cancer center expansion — renovation/alteration — the scope of work is located on level 24 and 29 of the existing memorial hermann medical plaza. it includes a new medical oncology clinic on level 24 and selective demolition and renovation on level 29 · 22 m away
- 6431 Fannin Street · University Of Texas System Office Of General Counsel-Real EstateApr 30, 2024Mcgovern msb wet lab renovation — renovation/alteration — interior renovations · 37 m away
- 6431 Fannin St · University Of Texas SystemsAug 16, 2024Uth som lrc student lounge — renovation/alteration — renovation of existing study area and lobby for new layout, study rooms, furniture, and renovated restrooms · 37 m away
- 6400 Fannin St · Vasso GrillSep 25, 20263,309 sq ft restaurant remodel · 81 m away
- 6400 Fannin St Ph · Memorial Hermann/Medical PlazaAug 21, 2026Mechanical room remodel sp/ (3/5) · 81 m away
- 6221 Main StJan 18, 2023200sf/commercial exterior entry ceiling repair · 132 m away
- 6410 Fannin St. G100 · Ut Health HoustonMar 28, 2025Mh cardiac rehab — renovation/alteration — interior renovation of existing tenant suite · 133 m away