6445 Main St Lvl23
Houston, TX 77030
28,460-square-foot hospital remodel permitted on Level 23
A 28,460-square-foot hospital remodel at 6445 Main St, Level 23, was permitted by Houston on Dec. 29, 2021 (permit 21079869). A separate permit dated Oct. 25, 2021, covers demolition of non-load-bearing, non-fire-rated walls (permit 21103323).
Summarized from City of Houston records · updated Dec 29, 2021
- Projects
- 3
- 3 filings
- Latest filing
- Dec 29, 2021
- since Jan 14, 2020
- Largest scope
- 28,460 sf
- Listed value
- —
Where this project stands
Permitted 2021 · no recent filings28,460 sq ft hospital remodel 100%
- Building permitDec 29, 2021
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
3 projectsSources: City of Houston
Questions about 6445 Main St Lvl23
What is being built at 6445 Main St, Level 23?
Houston permit records indicate a 28,460-square-foot hospital remodel, rather than a new building. Permit 21079869 was filed on Dec. 29, 2021.
When was the hospital remodel at 6445 Main permitted?
The 28,460-square-foot remodel was permitted on Dec. 29, 2021, under Houston permit 21079869.
What does permit 21103323 cover at 6445 Main St?
The Oct. 25, 2021, permit covers demolition of non-load-bearing, non-fire-rated walls.
Is a new hospital being built at 6445 Main St?
The available Houston permits describe a hospital remodel and interior wall demolition, not construction of a new hospital.
What's happening near Houston Methodist Hospital on Main Street?
At 6445 Main St, about 59 meters from Houston Methodist Hospital, Houston permitted a 28,460-square-foot hospital remodel on Dec. 29, 2021. The permit records do not state a connection to the nearby hospital.
What other work was permitted at 6445 Main St, Level 23?
A Jan. 14, 2020, Houston permit (19115610) describes a clean-room HVAC upgrade. The records also show wall demolition in October 2021 and the hospital remodel in December 2021.
Also being built nearby
All of 77030- 6445 Main St Lvl 2Oct 29, 2021Hospital systems remodel 12' (2-3)
- 6445 Main St Lvl16Aug 6, 20242,640 sq ft hospital interior remodel
- 6445 Main St Lvl21Apr 22, 20211,381 sq ft hospital intr remodel (m/2)
- 6445 Main St Lvl24Apr 22, 2021804 sq ft hospital intr remodel (2/2)
- 6445 Main St Lvl22Jun 12, 20231,900 s.f. outpatient center remodel
- 6445 Main St Lvl27Jan 14, 2020(epr)clean rm hvac upgrade (3/3) sp
- 6445 Main St Lvl26Aug 19, 20212,011 sq ft hi-rise hsptl office remodel 100%
- 6445 Main St Lvl25May 9, 202213,000 sq ft hosp rmdl (outpatient)
- 6445 Main StOct 14, 20241,200 sq ft hospital remodel
- 6445 Main St Lvl 3Oct 3, 20228,200 sq ft lab office remodel 100%sprnk
- 6501 Fannin Street · Houston Methodist HospitalAug 8, 2025Hmh neurosensory building room nb 123 exterior door relocation — renovation/alteration — relocation of an existing exterior entrance to the building, approximately 5 feet inward, reducing the interior building square footage. scope of work area = 88 square feet · 59 m away
- 6447 Main StOct 17, 2018(epr) hospital remodel 100% · 72 m away