6501 Fannin Street
Houston, TX 77030 · Hmh Neurosensory Building Room Nb 123 Exterior Door Relocation, Ltach Minor Renovation + 1 more
Hospital renovations and an exterior door relocation at 6501 Fannin
TDLR registrations list renovations in the multi-tenant building at 6501 Fannin Street, including work to a patient room and assisted bathing room, a conference room, and an exterior entrance. The latest filing, dated August 8, 2025, covers moving an existing entrance about five feet inward; earlier registrations were filed September 3, 2024, and December 12, 2023.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 8, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 8, 2025
- since Sep 3, 2024
- Largest scope
- 567 sf
- Estimated cost
- $750K
- state registration
Where this project stands
CompletedHMH Neurosensory Building Room NB 123 Exterior Door Relocation
88 sq ft · $60K est.
- RegisteredAug 8, 2025
- Plan review
- ConstructionJul '25 – Oct '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsRelocation of an existing exterior entrance to the building, approximately 5 feet inward, reducing the interior building square footage. scope of work area = 88 square feet. — the neurosensory center of houston
TDLR project registrationRenovation/AlterationProject Closed88 sq ft$60K est.- Project #
- TABS2025025426
- Tenant / owner
- Hmh Neurosensory Building Room Nb 123 Exterior Door Relocation
- Design firm
- Pro
- Contact
- Pro
Minor interior renovations of patient room and assisted bathing room to levels 8 and 9 of jones tower — houston methodist hospital jones tower 8th and 9th floor
TDLR project registrationRenovation/AlterationProject Closed567 sq ft$250K est.- Project #
- TABS2025000083
- Tenant / owner
- Ltach Minor Renovation
- Design firm
- Pro
- Contact
- Pro
Renovation of the bluebird conference room located in the neurosensory building level 1. renovation includes upgrades to the architectural finishes and a/v equipment system. — houston methodist hospital - neurosensory building
TDLR project registrationRenovation/AlterationProject Closed2,030 sq ft$750K est.- Project #
- TABS2024007264
- Tenant / owner
- N1 Bluebird Conference Room Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6501 Fannin Street
What is being built at 6501 Fannin Street?
The records describe renovations in a multi-tenant medical building, not a new building. The work includes patient-room and bathing-room renovations, a conference-room renovation, and relocation of an existing exterior entrance.
Is a new hospital being built at 6501 Fannin?
The records list renovation and alteration projects at the existing building, not construction of a new hospital. The latest TDLR registration, TABS2025025426, covers relocating an existing exterior entrance.
What work was permitted at 6501 Fannin in 2025?
A TDLR project registration dated August 8, 2025, describes moving an existing exterior entrance about five feet inward. The listed work area is 88 square feet, and the registration is marked closed.
What renovations are planned near Houston Methodist Hospital?
At 6501 Fannin, near Houston Methodist Hospital, TDLR records describe interior renovations to a patient room and assisted bathing room on Jones Tower levels 8 and 9. That registration, TABS2025000083, was filed September 3, 2024, and is marked closed.
Was the conference room at 6501 Fannin renovated?
A December 12, 2023, TDLR registration describes renovations to the Bluebird conference room on level 1 of the Neurosensory Building, including finishes and audiovisual equipment. The project is marked closed.
When were the projects at 6501 Fannin filed?
The three TDLR registrations were filed December 12, 2023, September 3, 2024, and August 8, 2025. They cover a conference-room renovation, patient-room and bathing-room renovations, and an exterior door relocation.
Also being built nearby
All of 77030- 6445 Main St Lvl27Jan 14, 2020(epr)clean rm hvac upgrade (3/3) sp · 59 m away
- 6445 Main St Lvl25May 9, 202213,000 sq ft hosp rmdl (outpatient) · 59 m away
- 6445 Main St Lvl22Jun 12, 20231,900 s.f. outpatient center remodel · 59 m away
- 6445 Main St Lvl24Apr 22, 2021804 sq ft hospital intr remodel (2/2) · 59 m away
- 6445 Main St Lvl 3Oct 3, 20228,200 sq ft lab office remodel 100%sprnk · 59 m away
- 6445 Main St Lvl23Dec 29, 202128,460 sq ft hospital remodel 100% · 59 m away
- 6445 Main St Lvl26Aug 19, 20212,011 sq ft hi-rise hsptl office remodel 100% · 59 m away
- 6445 Main St Lvl21Apr 22, 20211,381 sq ft hospital intr remodel (m/2) · 59 m away
- 6445 Main St Lvl 2Oct 29, 2021Hospital systems remodel 12' (2-3) · 59 m away
- 6445 Main St Lvl16Aug 6, 20242,640 sq ft hospital interior remodel · 59 m away
- 6445 Main StOct 14, 20241,200 sq ft hospital remodel · 59 m away
- 6501 Fannin St · Houston Methodist HospitalOct 31, 202598 sq ft hospital rmodl & ext. ramp 21' 100% spkl · 84 m away