groundranger
Recent · latest filing Jul 2026Commercial

6445 Main Street

Houston, TX 77030 · Opc 19 Renovations, Opc3 Neural Prosthetics Phase II + 5 more

Houston Methodist plans 200-square-foot Level 19 renovation

A 200-square-foot renovation at Houston Methodist's outpatient center on Level 19 converts a pharmacy into an anesthesia workroom and renovates an existing surgery nurse station. The TDLR registration was filed July 9, 2026, and lists the project as inspection complete. The applicant's estimated project cost is $98,000.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 9, 2026

Projects
7
7 filings
Latest filing
Jul 9, 2026
since Jun 24, 2024
Largest scope
1,200 sf
Estimated cost
$634K
state registration

Where this project stands

Inspected · closing out

OPC 19 RENOVATIONS

200 sq ft · $98K est.

  1. RegisteredJul 9, 2026
  2. Plan review
  3. ConstructionJul '26 – Aug '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

7 projects
  1. OPC 19 RENOVATIONS

    200 sq ft renovation of an existing surgery nurse station and conversion of a pharmacy into anesthesia workroom located in the outpatient center (opc) level 19. — houston methodist hospital

    TDLR project registrationRenovation/AlterationInspection Complete200 sq ft$98K est.
    Tenant / owner
    Opc 19 Renovations
    Design firm
    Pro
    Contact
    Pro
  2. Renovation will modify one existing cognitive exam room to accommodate a shielded anechoic chamber. the (4) existing exam rooms and procedure rooms will be renovated to include necessary grounding required. — houston methodist hospital - outpatient center

    TDLR project registrationRenovation/AlterationProject Closed1,200 sq ft$554K est.
    Tenant / owner
    Opc3 Neural Prosthetics Phase II
    Design firm
    Pro
    Contact
    Pro
  3. Renovation of rf rooms 17-068 and 17-073 located at level 17 of the opc building. the renovation will replace the rf equipment. — houston methodist hospital outpatient center

    TDLR project registrationRenovation/AlterationProject Closed782 sq ft$350K est.
    Tenant / owner
    Opc 17 Rf Room 068 And 073 Equipment
    Design firm
    Pro
    Contact
    Pro
  4. Equipment replacement of rooms p17-304 and p17-306 located in the nuclear medicine department of outpatient center (opc) level 17 — houston methodist outpatient center

    TDLR project registrationRenovation/AlterationProject Closed828 sq ft$480K est.
    Tenant / owner
    Hmh Opc17 P17-304 And P17-306 Spect
    Design firm
    Pro
    Contact
    Pro
  5. Equipment replacement of procedure room 043 located in the methodist outpatient center (opc) level 17. existing equipment will move to main building level b1. — houston methodist hospital outpatient center

    TDLR project registrationRenovation/AlterationProject Closed828 sq ft$345K est.
    Tenant / owner
    Hmh Opc 17 043 Pet Ct Replacement
    Design firm
    Pro
    Contact
    Pro
  6. Equipment replacement of procedure room 373 located in the methodist outpatient center (opc) level 17. — houston methodist hospital outpatient center

    TDLR project registrationRenovation/AlterationProject Closed686 sq ft$175K est.
    Tenant / owner
    Hmh Opc 17 373 Ct Replacement
    Design firm
    Pro
    Contact
    Pro
  7. Renovation to add a nurse station, private offices, and staff work areas. renovation will also upgrade the architectural finishes, mep, it/low voltage, and security systems at renovated areas. — houston methodist hospital outpatient center

    TDLR project registrationRenovation/AlterationProject Closed1,900 sq ft$634K est.
    Tenant / owner
    Hmh Opc 22 Liver Center Renovation
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 6445 Main Street

What is being built at 6445 Main Street?

A 200-square-foot renovation at Houston Methodist's outpatient center on Level 19 converts a pharmacy into an anesthesia workroom and renovates an existing surgery nurse station.

When was the 6445 Main Street renovation filed?

The TDLR registration, project TABS2026024954, was filed July 9, 2026. Its status is listed as inspection complete.

How much will the 6445 Main Street renovation cost?

The TDLR registration lists an applicant estimate of $98,000 for the project.

Is Houston Methodist renovating a surgery nurse station?

Yes. The project description calls for renovating an existing surgery nurse station at the outpatient center on Level 19, as well as converting a pharmacy into an anesthesia workroom.

What's being renovated near Murphy's Deli on Fannin Street?

A TDLR registration describes a 200-square-foot renovation at Houston Methodist's outpatient center, about 170 meters from Murphy's Deli. The work is on Level 19.

Is there a new anesthesia workroom near the Smith medical offices on Fannin Street?

The project description says a pharmacy at Houston Methodist's outpatient center on Level 19 will be converted into an anesthesia workroom. The listed Smith medical offices at 6550 Fannin Street are about 157 meters away.

Also being built nearby

All of 77030

More medical facilities in 77030.

Email me when the project is closed