6560 Fannin Street Houston TX 77030
Houston, TX 77030 · Tmh Medical Office Buildings
Suite 1404 renovation registered at 6560 Fannin Street
A 6,275-square-foot renovation at 6560 Fannin Street combines two suites into one medical office space in Scurlock Tower. The project was registered with TDLR on February 7, 2024, and its status is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 7, 2024
- since Feb 7, 2024
- Largest scope
- 6,275 sf
- Estimated cost
- $628K
- state registration
Where this project stands
CompletedHMMOB Scurlock Ste 1404 Dr. Haas Expansion
6,275 sq ft · $628K est.
- RegisteredFeb 7, 2024
- Plan review
- ConstructionAug '24 – Dec '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProject sq ft 6,275. renovation of two suites into one, including exam, office, flex, and breakroom spaces. also, reception, waiting, conference, storage, i.t. and other supporting spaces such as toilets. — scurlock tower
TDLR project registrationRenovation/AlterationProject Closed6,275 sq ft$628K est.- Project #
- TABS2024010997
- Tenant / owner
- Hmmob Scurlock Ste 1404 Dr. Haas Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6560 Fannin Street Houston TX 77030
What is being built at 6560 Fannin Street in Houston?
A renovation combines two suites into one 6,275-square-foot medical office space in Scurlock Tower. The plans include exam, office, flex, reception, waiting, conference, storage, IT, and breakroom areas.
When was the 6560 Fannin Street project permitted?
The project was registered with the Texas Department of Licensing and Regulation on February 7, 2024. Its registration number is TABS2024010997.
Is this a new building at 6560 Fannin Street?
No new building is described in the record. It identifies a renovation of two existing suites into one.
What is the estimated cost of the 6560 Fannin Street renovation?
The applicant estimated the project cost at $627,777 in the TDLR registration.
What is being renovated near The Methodist Hospital on Fannin Street?
A 6,275-square-foot medical office renovation was registered at 6560 Fannin Street, the same address listed for The Methodist Hospital. The plans combine two suites into one.
Is the Scurlock Tower suite 1404 project complete?
The TDLR record lists the project status as closed. It was registered on February 7, 2024.
Also being built nearby
All of 77030- 6560 Fannin Street 950 · Tmh Medical Office BuildingsFeb 23, 2026Hm scur - po neuro pain - public corridor — renovation/alteration — renovation of a suite in an existing mob
- 6560 Fannin Street · The Methodist HospitalApr 27, 2026Hmmob scurlock tower 1016 - southwest orthopedics — renovation/alteration — renovation of part of suite 1016 that includes a waiting room and break room (1,114 sq ft)
- 6560 Fannin Street 900 · Tmh Medical Office BuildingsFeb 23, 2026Hm scur - po neuro pain - suite 900 — renovation/alteration — renovation of a suite in an existing mob
- 6565 Fannin Street, Neuro Level B · Houston MethodistApr 1, 2026Hmh histology shell buildout — renovation/alteration — build out of existing shell space for medical residents · 14 m away
- 6565 Fannin · Houston MethodistFeb 27, 2025Hmh db1 pharmacy upgrades — renovation/alteration — this project is intended to help facilitate the addition of new equipment in cleanrooms db1013 and db1019 on level b1 of the dunn tower. hvac upgrades will be made as part of this project to accommodate the new equipment · 14 m away
- 6565 Fannin St BrdgeNov 19, 2018(epr) hospital remodel 100% · 14 m away
- 6565 Fannin Street · Houston Methodist HospitalDec 3, 2024Hmh fondren 6 restroom renovation — renovation/alteration — renovation of existing restrooms and locker room located on fondren level 6 to meet current accessibility requirements · 14 m away
- 6565 Fannin Street · Houston Methodist HospitalMar 5, 2026Hmh fondren 9 nuclear camera renovation — renovation/alteration — renovation of the fondren 9 nuclear cardiology suite. the renovation includes the relocation of an existing spect into new nuclear camera room, a new nuclear camera room, shared control room, hot lab, and dressing room · 14 m away
- 6550 Fannin Street · Methodist HospitalDec 1, 2025Hm smith – po medicine – suite 1101 — renovation/alteration — interior renovation of existing suite in a multi-story medical office building · 17 m away
- 6550 Fannin St, Houston. Tx. 77030 · Houston Methodist HospitalJun 26, 2026Smith 201 admin office renovation — renovation/alteration — renovation of 2,570 sq ft of administrative offices at smith tower level 2 in the medical center · 17 m away
- 6580 Fannin St BsmtJan 3, 2019New boiler replacement · 34 m away
- 6550 Fannin St · Murphy's DeliOct 27, 20263,051 sq ft restaurant remodel · 41 m away