6620 Main St
Houston, TX 77030
Medical-office remodels and a skybridge permitted at 6620 Main
Houston permits indicate interior remodels to medical-office space and a new pedestrian walkway or skybridge at 6620 Main St. The permits were filed from Feb. 14 to Aug. 23, 2022, and also cover office buildout and lobby and equipment-room work.
Summarized from City of Houston records · updated Aug 23, 2022
- Projects
- 12
- 12 filings
- Latest filing
- Aug 23, 2022
- since Feb 14, 2022
- Largest scope
- 42,960 sf
- Listed value
- —
Where this project stands
Permitted 2022 · no recent filingsHi-rise 5615 sq ft medical office rmdl sp/ (14/14)
5,615 sq ft
- Building permitAug 23, 2022
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
12 projectsSources: City of Houston
Questions about 6620 Main St
What is being built at 6620 Main St in Houston?
City permits describe high-rise medical-office remodels, office buildout, and a new 7,600-square-foot pedestrian walkway or skybridge. The filings date from Feb. 14 to Aug. 23, 2022.
Is a new medical office opening at 6620 Main St?
The permits describe remodels to medical-office space, not a new medical facility opening. They do not identify a tenant or opening date.
Is a skybridge planned at 6620 Main St?
A Houston permit filed Feb. 14, 2022, describes a new 7,600-square-foot pedestrian walkway or skybridge. The permit number is 21101288.
What work was permitted for the medical offices at 6620 Main?
Permits filed Aug. 23, 2022, cover high-rise medical-office remodels and lobby, equipment, and IDF-room work. Examples include permits 22042519 and 22042531.
What's being built near Medical Center Crossing on Main Street?
Permits at 6620 Main St, about 92 meters from Medical Center Crossing, describe medical-office remodels and a pedestrian walkway or skybridge. The filings date from February through August 2022.
What permits were filed for 6620 Main St in 2022?
The City of Houston records include permits for office and medical-office work, demolition of interior walls, and a pedestrian walkway or skybridge. The first filing was Feb. 14, 2022, and the latest was Aug. 23, 2022.
Also being built nearby
All of 77030- 6620 Main St GaragAug 23, 2022Hi-rise 55 sq ft idf room bldout (fl4) sp/ (5/14)
- 6633 Travis St · Hilton - Houston PlazaMay 11, 2026Hi-rise interior hotel remodel(fl 9) · 50 m away
- 6624 Main StAug 19, 20221,997 sq ft office remodel 100% · 50 m away
- 6655 Travis St · Amerionix ConstructionOct 2, 2026Office sidewalk repair · 59 m away
- 6633 Travis Street · Houston Medical Center Hotel LLCMar 24, 2026Hilton level 9 — renovation/alteration — renovation/refresh of guest rooms · 68 m away
- 6605 Main St · Medical Center CrossingMay 20, 2026Demolition of interior non-load bearing non-fire rated walls · 92 m away
- 6634 Travis StFeb 24, 2023Demolition bld/sewer disc · 93 m away
- 6620 Main Street · Texas Children's HospitalJun 19, 2024Pavilion tower ii 15 — renovation/alteration — renovation admin office space. 26 private offices, 12 workstations, 1 workroom, 1 open touch down space, 28-person conference room, 34-person conference room, staff lounge, supply room & copy/print alcoves · 97 m away
- 6624 Fannin St · Md Anderson Fannin TowerMay 4, 202620,908 sq ft clinic office buildout · 100 m away
- 1904 Addison RdMay 29, 2024Vehicle access gates gc#22064668 · 106 m away
- 6611 Main StApr 22, 2019Buildout of restaurant sprk · 106 m away
- 1905 Swift BlvdJun 27, 2024Installation of tesla powerwall to existing solar pv system · 108 m away
More demolitions in 77030, medical facilities in 77030, offices in 77030.