6633 Travis St
Houston, TX 77030 · Hilton - Houston Plaza
Hilton Houston Plaza has a ninth-floor hotel remodel
City of Houston permits indicate interior hotel remodeling at Hilton Houston Plaza, 6633 Travis St. A permit filed May 11, 2026, describes work on the ninth floor; a May 6 permit covers demolition of interior non-load-bearing walls.
Summarized from City of Houston records · updated May 11, 2026
- Projects
- 6
- 9 filings
- Latest filing
- May 11, 2026
- since Aug 29, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted · trades not filed yetHi-rise interior hotel remodel(fl 9)
- Building permitMay 11, 2026
- Trade permits
- Occupancy
Plumbing, electrical and fire subcontractors usually file next.
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 1 phone number
Permit & project history
6 projectsSources: City of Houston
Questions about 6633 Travis St
What is being built at 6633 Travis St in Houston?
City permits indicate interior remodeling at Hilton Houston Plaza, rather than a new building. The latest listed permit, filed May 11, 2026, describes a ninth-floor hotel remodel.
Is a new hotel being built at 6633 Travis St?
The listed permits describe hotel and office remodeling, parking garage work, and interior demolition. They do not describe a new hotel building.
What work is happening on the ninth floor at Hilton Houston Plaza?
A City of Houston permit filed May 11, 2026, describes a high-rise interior hotel remodel on floor 9. The permit number is 25115892.
What was the May 2026 permit for at 6633 Travis St?
A May 11, 2026, permit describes a ninth-floor hotel remodel (permit 25115892). A May 6 permit covers demolition of interior non-load-bearing, non-fire-rated walls (permit 25113448).
What's being remodeled near MD Anderson Fannin Tower?
Hilton Houston Plaza at 6633 Travis St has permits for interior hotel remodeling. The address is listed about 143 meters from MD Anderson Fannin Tower.
Has Hilton Houston Plaza had other remodeling permits?
Yes. City records include a hotel lobby and seating remodel permit from August 29, 2019, a high-rise hotel remodel permit from October 2, 2019, and an office remodel permit from January 7, 2021.
Also being built nearby
All of 77030- 6633 Travis Street · Houston Medical Center Hotel LLCMar 24, 2026Hilton level 9 — renovation/alteration — renovation/refresh of guest rooms · 30 m away
- 6655 Travis St · Amerionix ConstructionOct 2, 2026Office sidewalk repair · 40 m away
- 6620 Main St GaragAug 23, 2022Hi-rise 55 sq ft idf room bldout (fl4) sp/ (5/14) · 50 m away
- 6620 Main StAug 23, 2022Hi-rise 5400 sq ft lobby/equip/idf rmdl sp/ (2/14) · 50 m away
- 1905 Swift BlvdJun 27, 2024Installation of tesla powerwall to existing solar pv system · 63 m away
- 6634 Travis StFeb 24, 2023Demolition bld/sewer disc · 66 m away
- 1906 Swift BlvdNov 19, 2024Residential remodel · 81 m away
- 1904 Addison RdMay 29, 2024Vehicle access gates gc#22064668 · 83 m away
- 6624 Main StAug 19, 20221,997 sq ft office remodel 100% · 98 m away
- 6605 Main St · Medical Center CrossingMay 20, 2026Demolition of interior non-load bearing non-fire rated walls · 104 m away
- 1916 Addison Rd · 155 Global LLCFeb 23, 2026Single-family residence with attached garage · 104 m away
- 1934 Addison RdSep 21, 2018Residential interior remodel · 107 m away
More demolitions in 77030, hotels in 77030, offices in 77030.