6720 Bertner Ave B 2
Houston, TX 77030
6720 Bertner Ave B 2: 1 project on record
City of Houston lists 1 filing across 1 project at 6720 Bertner Ave B 2, Houston, TX 77030. The most recent, filed November 2, 2023, covers: “Hospital ahu replacem't 100% 2/6”.
Compiled from City of Houston records · updated Nov 2, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 2, 2023
- since Nov 2, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2023 · no recent filingsHospital ahu replacem't 100% 2/6
- Building permitNov 2, 2023
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 6720 Bertner Ave B 2
What is being built at 6720 Bertner Ave B 2?
The latest filing (City of Houston permit 23015760, November 2, 2023) covers hospital ahu replacem't 100% 2/6.
How many permits and filings does 6720 Bertner Ave B 2 have?
1 filing across 1 project, from November 2, 2023 to November 2, 2023.
What is being built near Baylor St Luke's Medical Center in Houston?
6720 Bertner Ave B 2 is about 0 m from Baylor St Luke's Medical Center (6720 Bertner Ave B-1). Its latest filing is for hospital ahu replacem't 100% 2/6.
Is there other construction near 6720 Bertner Ave B 2?
Yes. Nearby filings include 6720 Bertner St B-1 (interior demolition non-load bearing / non-fire-rated walls, May 6, 2021); 6720 Bertner Ave B-1 (1,210 sq ft med off. remodel. (m/2) -a, Jul 23, 2025); 6720 Bertner St (5,272 sq ft hospital lab remodel, Dec 12, 2023).
How do I get alerts for new permits at 6720 Bertner Ave B 2?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77030- 6720 Bertner St B-1May 6, 2021Interior demolition non-load bearing / non-fire-rated walls
- 6720 Bertner Ave B-1 · Baylor St Luke's Medical CenterJul 23, 20251,210 sq ft med off. remodel. (m/2) -a
- 6720 Bertner StDec 12, 20235,272 sq ft hospital lab remodel
- 6720 Bertner Ave · Baylor St. Luke'sApr 29, 20262,124 sq ft lab equipment remodel
- 6770 Bertner Avenue · Board Of Regents University Of TexasOct 23, 2026Bcm -the marcus-vital labs — renovation/alteration — existing interior suite renovation of an existing multi story building on level 5 for office, simulation lab, and support spaces with associated mep systems · 114 m away
- 6621 Fannin St · Texas Childrens Hospital (west Tower)Sep 15, 20261,300 sq ft hospital remodel 100% · 115 m away
- 6621 Fannin St Bsmt2Apr 16, 20241,692 sq ft hospital remodel · 115 m away
- 6720 Bertner Avenue · Commonspirit HealthNov 11, 2026Csh bslmc cath labs 11(b13) reno — renovation/alteration — renovation of existing cath lab to include an equipment swap and updated finishes · 132 m away
- 6621 Fannin Basement Level 1 · Texas Children's HospitalFeb 12, 2024West tower b1- mass spectrometer — renovation/alteration — the scope of work for this 2500 sq ft renovation includes removing existing millwork to make room for owner provided lab tables for 2 new mass spectrometers. exhaust lines and electrical outlets will be added, as well as a new work sink · 152 m away
- 6621 Fannin Street · Texas Children's HospitalOct 27, 2026Tch wt omnicell carousel — renovation/alteration — this project consists of the replacement of two existing medcarousels on level b1 of the west tower at texas children’s hospital with new omnicell medcarousels installed within the existing footprint. in addition, the project includes mechanical · 152 m away
- 1102 Bates Ave L-3Jul 8, 2022215 sq ft hospital equipment remodel · 152 m away
- 1102 Bates Ave · Texas Children's HospitalAug 3, 20266,000 sq ft hospital remodel 100 % · 152 m away