6720 Bertner Avenue
Houston, TX 77030 · Csh Bslmc Cath Labs 11(b13) Reno, Csh TX Bslmc Cath Labs 4 (a09) And 9 (e09) + 3 more
Cath lab renovations registered at Baylor St. Luke’s
Two cath lab renovation projects are registered at the multi-tenant medical site at 6720 Bertner Avenue. The work includes equipment swaps and updated finishes in existing labs; the registrations were filed January 26 and November 11, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 11, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Nov 11, 2026
- since Sep 16, 2024
- Largest scope
- 2,124 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
In state plan reviewCSH BSLMC CATH LABS 11(B13) RENO
710 sq ft · $1.0M est.
- RegisteredNov 11, 2026
- Plan reviewnow
- ConstructionDec '26 – May '27
- Inspected
- Closed
Construction is scheduled to start Dec 7, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
5 projectsRenovation of existing cath lab to include an equipment swap and updated finishes — baylor st. luke's medical center
TDLR project registrationRenovation/AlterationProject Registered710 sq ft$1.0M est.- Project #
- TABS2027005668
- Tenant / owner
- Csh Bslmc Cath Labs 11(b13) Reno
- Design firm
- Pro
- Contact
- Pro
Renovation of existing cath labs to include an equipment swap and updated finishes — baylor st luke's medical center
TDLR project registrationRenovation/AlterationReview Complete2,124 sq ft$2.0M est.- Project #
- TABS2026010819
- Tenant / owner
- Csh TX Bslmc Cath Labs 4 (a09) And 9 (e09)
- Design firm
- Pro
- Contact
- Pro
Medical equipment replacement to the hybrid or #11 (cvor) room. the project includes modifications to the existing room to accommodate the new equipment, which includes new finishes and infrastructure modifications. — csh - baylor st. luke's medical center
TDLR project registrationRenovation/AlterationInspection Complete1,120 sq ft$1.5M est.- Project #
- TABS2025008369
- Tenant / owner
- Bslmc Fy25 Med Eq Upgrades - Hybrid Or
- Design firm
- Pro
- Contact
- Pro
The intent of the project is to renovate the existing nuclear medicine spet ct department on level 3. the work is to include a cosmetic refresh to the entire suite, installation of new spect equip within a newly enclosed room. — csh - baylor st. luke's medical center
TDLR project registrationRenovation/AlterationProject Closed1,913 sq ft$1.0M est.- Project #
- TABS2025005741
- Tenant / owner
- Bslmc Fy25 Med Eq Upgrades - Spect Ct
- Design firm
- Pro
- Contact
- Pro
Medical equipment replacement and interior renovation of existing mri room #3 — csh - baylor st. luke's medical center
TDLR project registrationRenovation/AlterationProject Closed550 sq ft$465K est.- Project #
- TABS2025001021
- Tenant / owner
- Mri#3 Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6720 Bertner Avenue
What is being built at 6720 Bertner Avenue?
Two existing cath labs are being renovated, with equipment swaps and updated finishes. The work is registered at the multi-tenant medical site associated with Baylor St. Luke’s Medical Center.
When were the cath lab projects filed?
The registrations were filed January 26, 2026, and November 11, 2026. They are TDLR project registrations TABS2026010819 and TABS2027005668.
Is a new hospital being built at 6720 Bertner Avenue?
The registrations describe renovations of existing cath labs, not a new hospital. The work includes equipment swaps and updated finishes.
What work is planned at Baylor St. Luke’s Medical Center?
The registered projects cover renovations to existing cath labs, including equipment swaps and updated finishes. One project covers labs 4 and 9, and the other covers lab 11.
What is being renovated near Houston Methodist Hospital on Bertner Avenue?
Two cath lab renovation projects are registered at 6720 Bertner Avenue, about 58 meters from Houston Methodist Hospital. The work involves existing labs, equipment swaps and updated finishes.
Are the projects at 6720 Bertner Avenue new construction?
No. The TDLR records classify both projects as renovation or alteration of existing cath labs.
Also being built nearby
All of 77030- 6541 Bertner Ave · Houston Methodist HospitalMar 20, 2026Hi-rise 38946 sq ft hospital floor buildout sp · 58 m away
- 6670 Bertner StJun 7, 2018Hospital fl convrt-imaging equip upgrade/ s/a · 59 m away
- 6670 Bertner Avenue · Houston Methodist HospitalNov 18, 2025Hmri level 1 medtrace addition — renovation/alteration — addition of new medtrace p3 equipment at pet/ct room at level 1 of hm research institute (hmri). the scope includes continuation of routing new o15 lines inside a lead lined enclosure from cyclotron hot cell lab up to level 1 location · 59 m away
- 6770 Bertner Avenue · Board Of Regents University Of TexasOct 23, 2026Bcm -the marcus-vital labs — renovation/alteration — existing interior suite renovation of an existing multi story building on level 5 for office, simulation lab, and support spaces with associated mep systems · 84 m away
- 6670 Bertner Ave · Houston Methodist Research InstituteMay 20, 2026Research lab electrical bank remodel · 91 m away
- 6720 Bertner Ave B-1 · Baylor St Luke's Medical CenterJul 23, 20251,210 sq ft med off. remodel. (m/2) -a · 132 m away
- 6720 Bertner StDec 12, 20235,272 sq ft hospital lab remodel · 132 m away
- 6720 Bertner St B-1May 6, 2021Interior demolition non-load bearing / non-fire-rated walls · 132 m away
- 6720 Bertner Ave B 2Nov 2, 2023Hospital ahu replacem't 100% 2/6 · 132 m away
- 6720 Bertner Ave · Baylor St. Luke'sApr 29, 20262,124 sq ft lab equipment remodel · 132 m away
- 6565 Fannin St Bsmt1 · The Methodist HospitalMay 14, 2025(m/2) hospital ahu replacement · 160 m away
- 6565 Fannin St Bsmt2 · The Methodist HospitalSep 3, 2025(2/2) hospital ahu replacement · 160 m away