6670 Bertner Ave
Houston, TX 77030 · Houston Methodist Research Institute, The Methodist Hospital + 1 more
Lab renovations and electrical work permitted at 6670 Bertner
Houston permits filed in March and May 2026 describe lab renovations and an electrical bank remodel at this multi-tenant medical building. The March 4 permit, #25044563, covers 2,300 square feet of lab/bookout center renovations; the May 20 permit, #25103908, describes research lab electrical bank work.
Summarized from City of Houston, Texas Department of Licensing and Regulation records · updated May 20, 2026
- Projects
- 4
- 13 filings
- Latest filing
- May 20, 2026
- since Feb 15, 2024
- Largest scope
- 2,300 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Certificate of occupancy issuedResearch lab electrical bank remodel
- Building permitMay 20, 2026
- Trade permits
- OccupancyMay 20, 2026
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
2 contacts on this project · 1 phone number
Permit & project history
4 projectsRenovation includes 1,300 sq ft buildout research lab at the bookout center and renovation of 1,000 sq ft to accommodate additional storage. — houston methodist research institute
TDLR project registrationRenovation/AlterationInspection Complete2,300 sq ft$1.2M est.- Project #
- TABS2025018678
- Tenant / owner
- Hmri R5 Mitie Bookout Center Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: City of Houston · Texas Department of Licensing and Regulation
Questions about 6670 Bertner Ave
What is being built at 6670 Bertner Ave?
Houston permits describe renovations to a 2,300-square-foot lab/bookout center and a research lab electrical bank remodel. The records indicate renovation work, not a new building.
What work was permitted at 6670 Bertner Ave in 2026?
Permit #25044563, filed March 4, 2026, describes 2,300 square feet of lab/bookout center renovations. Permit #25103908, filed May 20, 2026, describes a research lab electrical bank remodel.
Is a new lab opening at 6670 Bertner Ave?
The available Houston permit descriptions indicate renovations to a lab/bookout center and research lab electrical work. They do not say that a new lab is opening.
What work is planned at 6670 Bertner Ave near Houston Methodist Hospital?
Permits at 6670 Bertner Ave describe lab renovations and an electrical bank remodel. Houston Methodist Hospital is listed as a nearby landmark at 6541 Bertner Ave.
What is changing at 6670 Bertner Ave near the Texas Medical Center?
Houston permit records describe a 2,300-square-foot lab/bookout center renovation and a research lab electrical bank remodel. The Texas Medical Center is listed as a nearby landmark.
How large is the lab renovation at 6670 Bertner Ave?
The March 4, 2026 permit, #25044563, lists 2,300 square feet of lab/bookout center renovations.
Also being built nearby
All of 77030- 6670 Bertner StJun 7, 2018Hospital fl convrt-imaging equip upgrade/ s/a · 33 m away
- 6670 Bertner Avenue · Houston Methodist HospitalNov 18, 2025Hmri level 1 medtrace addition — renovation/alteration — addition of new medtrace p3 equipment at pet/ct room at level 1 of hm research institute (hmri). the scope includes continuation of routing new o15 lines inside a lead lined enclosure from cyclotron hot cell lab up to level 1 location · 33 m away
- 6541 Bertner Ave · Houston Methodist HospitalMar 20, 2026Hi-rise 38946 sq ft hospital floor buildout sp · 47 m away
- 6565 Fannin St Bsmt1 · The Methodist HospitalMay 14, 2025(m/2) hospital ahu replacement · 75 m away
- 6565 Fannin St Fl10Dec 10, 20198,300 sq ft (lvl 10) hosptl rmdl 100% (4 of 4) · 75 m away
- 6565 Fannin St Bsmt2 · The Methodist HospitalSep 3, 2025(2/2) hospital ahu replacement · 75 m away
- 6565 Fannin St B-1Nov 8, 2022Utilites connections in b-1 room (4/4) · 75 m away
- 6565 Fannin St · Houston Methodist HospitalJul 10, 20264,108 sq ft hospital office remodel (m/3) · 75 m away
- 6720 Bertner Avenue · Commonspirit HealthNov 11, 2026Csh bslmc cath labs 11(b13) reno — renovation/alteration — renovation of existing cath lab to include an equipment swap and updated finishes · 91 m away
- 6550 Bertner Avenue · Texas Medical CenterAug 11, 2026Starbucks svm coffee — renovation/alteration — finish out of a starbucks in suite 105 · 135 m away
- 6550 Bertner Ave · Texas Medical CenterJul 13, 2026Garage facade remodel with sitewk improvement / (m/5) · 144 m away
- 6551 Bertner StOct 9, 20203,290 sq ft interior hospital remodel sp · 144 m away