6670 Bertner Avenue
Houston, TX 77030 · Hmri Level 1 Medtrace Addition, Hm Research Institute Building Load Bank + 2 more
Research institute equipment upgrades at 6670 Bertner Avenue
Two renovation and alteration projects are registered for the multi-tenant building at 6670 Bertner Avenue: new MedTrace P3 equipment in a level 1 PET/CT room and a rooftop electrical load bank. TDLR records date the registrations October 30 and November 18, 2025, and identify the projects with Houston Methodist Research Institute.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 18, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Nov 18, 2025
- since Oct 30, 2025
- Largest scope
- 250 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
CompletedHMRI Level 1 MedTrace Addition
250 sq ft · $500K est.
- RegisteredNov 18, 2025
- Plan review
- ConstructionJan '26 – Mar '26
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
4 projectsAddition of new medtrace p3 equipment at pet/ct room at level 1 of hm research institute (hmri). the scope includes continuation of routing new o15 lines inside a lead lined enclosure from cyclotron hot cell lab up to level 1 location — houston methodist research institute
TDLR project registrationRenovation/AlterationProject Closed250 sq ft$500K est.- Project #
- TABS2026006186
- Tenant / owner
- Hmri Level 1 Medtrace Addition
- Design firm
- Pro
- Contact
- Pro
Installation of a new electrical load bank located on the roof of the research institute building. — houston methodist research institute
TDLR project registrationRenovation/AlterationReview Complete30 sq ft$498K est.- Project #
- TABS2026004708
- Tenant / owner
- Hm Research Institute Building Load Bank
- Design firm
- Pro
- Contact
- Pro
Renovation of 1,800 sq ft of the behavioral suite located on level 4 of the hmri. the renovation will include (3) experimental rooms, (1) small recording room, (1) large recording room, control room, flex room, and a common room. — houston methodist research institute
TDLR project registrationRenovation/AlterationProject Closed1,800 sq ft$533K est.- Project #
- TABS2024005289
- Tenant / owner
- Hmri Level 4 Behavioral Suite
- Design firm
- Pro
- Contact
- Pro
Renovation of existing imaging suite to include (2) new patient prep rooms and replacement of existing pet/ct located in room r1-342. — houston methodist hospital research institute
TDLR project registrationRenovation/AlterationProject Closed1,300 sq ft$1.2M est.- Project #
- TABS2023027082
- Tenant / owner
- Hmhri Level 1 Pet Ct
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6670 Bertner Avenue
What is being built at 6670 Bertner Avenue?
TDLR records describe two renovations: an addition of MedTrace P3 equipment in a level 1 PET/CT room and installation of a rooftop electrical load bank. The records identify both projects with Houston Methodist Research Institute.
When were the projects at 6670 Bertner Avenue registered?
The rooftop load bank project was registered October 30, 2025, under TABS2026004708. The MedTrace addition was registered November 18, 2025, under TABS2026006186.
Is a new building being built at 6670 Bertner Avenue?
The two TDLR records describe renovation and alteration work, not construction of a new building.
What's going in near Houston Methodist Hospital on Bertner Avenue?
At 6670 Bertner Avenue, TDLR records list new MedTrace P3 equipment in a level 1 PET/CT room and a rooftop electrical load bank. Houston Methodist Hospital is listed as a nearby landmark.
Is the work at 6670 Bertner Avenue for Houston Methodist Research Institute?
The project records name Houston Methodist Research Institute in their descriptions. The address is a multi-tenant building, and the records do not identify the entire site as belonging to one tenant.
How much will the 6670 Bertner Avenue projects cost?
The TDLR registration for the MedTrace addition lists an estimated project cost of $500,000. The available records do not give a combined estimate for both projects.
Also being built nearby
All of 77030- 6670 Bertner StJun 7, 2018Hospital fl convrt-imaging equip upgrade/ s/a
- 6541 Bertner Ave · Houston Methodist HospitalMar 20, 2026Hi-rise 38946 sq ft hospital floor buildout sp · 21 m away
- 6670 Bertner Ave · Houston Methodist Research InstituteMay 20, 2026Research lab electrical bank remodel · 33 m away
- 6720 Bertner Avenue · Commonspirit HealthNov 11, 2026Csh bslmc cath labs 11(b13) reno — renovation/alteration — renovation of existing cath lab to include an equipment swap and updated finishes · 59 m away
- 6565 Fannin St Bsmt1 · The Methodist HospitalMay 14, 2025(m/2) hospital ahu replacement · 106 m away
- 6565 Fannin St Fl10Dec 10, 20198,300 sq ft (lvl 10) hosptl rmdl 100% (4 of 4) · 106 m away
- 6565 Fannin St Bsmt2 · The Methodist HospitalSep 3, 2025(2/2) hospital ahu replacement · 106 m away
- 6565 Fannin St B-1Nov 8, 2022Utilites connections in b-1 room (4/4) · 106 m away
- 6565 Fannin St · Houston Methodist HospitalJul 10, 20264,108 sq ft hospital office remodel (m/3) · 106 m away
- 6770 Bertner Avenue · Board Of Regents University Of TexasOct 23, 2026Bcm -the marcus-vital labs — renovation/alteration — existing interior suite renovation of an existing multi story building on level 5 for office, simulation lab, and support spaces with associated mep systems · 143 m away
- 6550 Bertner Ave · Texas Medical CenterJul 13, 2026Garage facade remodel with sitewk improvement / (m/5) · 144 m away
- 6550 Bertner Avenue · Texas Medical CenterAug 11, 2026Starbucks svm coffee — renovation/alteration — finish out of a starbucks in suite 105 · 145 m away