6670 Bertner St
Houston, TX 77030
6670 Bertner St: 3 projects on record
City of Houston lists 3 filings across 3 projects at 6670 Bertner St, Houston, TX 77030 since July 17, 2017. The most recent, filed June 7, 2018, covers: “Hospital fl convrt-imaging equip upgrade/ s/a”.
Compiled from City of Houston records · updated Jun 7, 2018
- Projects
- 3
- 3 filings
- Latest filing
- Jun 7, 2018
- since Jul 17, 2017
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2018 · no recent filingsHospital fl convrt-imaging equip upgrade/ s/a
- Building permitJun 7, 2018
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
3 projectsSources: City of Houston
Questions about 6670 Bertner St
What is being built at 6670 Bertner St?
The latest filing (City of Houston permit 18045287, June 7, 2018) covers hospital fl convrt-imaging equip upgrade/ s/a.
How many permits and filings does 6670 Bertner St have?
3 filings across 3 projects, from July 17, 2017 to June 7, 2018.
What is being built near Houston Methodist Hospital in Houston?
6670 Bertner St is about 0 m from Houston Methodist Hospital (6670 Bertner Avenue). Its latest filing is for hospital fl convrt-imaging equip upgrade/ s/a.
Is there other construction near 6670 Bertner St?
Yes. Nearby filings include 6670 Bertner Avenue (hmri level 1 medtrace addition — renovation/alteration — addition of new medtrace p3 equipment at pet/ct room at level 1 of hm research institute (hmri). the scope includes continuation of routing new o15 lines inside a lead lined enclosure from cyclotron hot cell lab up to level 1 location, Nov 18, 2025); 6541 Bertner Ave (hi-rise 38946 sq ft hospital floor buildout sp, Mar 20, 2026); 6670 Bertner Ave (research lab electrical bank remodel, May 20, 2026).
How do I get alerts for new permits at 6670 Bertner St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77030- 6670 Bertner Avenue · Houston Methodist HospitalNov 18, 2025Hmri level 1 medtrace addition — renovation/alteration — addition of new medtrace p3 equipment at pet/ct room at level 1 of hm research institute (hmri). the scope includes continuation of routing new o15 lines inside a lead lined enclosure from cyclotron hot cell lab up to level 1 location
- 6541 Bertner Ave · Houston Methodist HospitalMar 20, 2026Hi-rise 38946 sq ft hospital floor buildout sp · 21 m away
- 6670 Bertner Ave · Houston Methodist Research InstituteMay 20, 2026Research lab electrical bank remodel · 33 m away
- 6720 Bertner Avenue · Commonspirit HealthNov 11, 2026Csh bslmc cath labs 11(b13) reno — renovation/alteration — renovation of existing cath lab to include an equipment swap and updated finishes · 59 m away
- 6565 Fannin St Bsmt1 · The Methodist HospitalMay 14, 2025(m/2) hospital ahu replacement · 106 m away
- 6565 Fannin St Fl10Dec 10, 20198,300 sq ft (lvl 10) hosptl rmdl 100% (4 of 4) · 106 m away
- 6565 Fannin St Bsmt2 · The Methodist HospitalSep 3, 2025(2/2) hospital ahu replacement · 106 m away
- 6565 Fannin St B-1Nov 8, 2022Utilites connections in b-1 room (4/4) · 106 m away
- 6565 Fannin St · Houston Methodist HospitalJul 10, 20264,108 sq ft hospital office remodel (m/3) · 106 m away
- 6770 Bertner Avenue · Board Of Regents University Of TexasOct 23, 2026Bcm -the marcus-vital labs — renovation/alteration — existing interior suite renovation of an existing multi story building on level 5 for office, simulation lab, and support spaces with associated mep systems · 143 m away
- 6550 Bertner Ave · Texas Medical CenterJul 13, 2026Garage facade remodel with sitewk improvement / (m/5) · 144 m away
- 6550 Bertner Avenue · Texas Medical CenterAug 11, 2026Starbucks svm coffee — renovation/alteration — finish out of a starbucks in suite 105 · 145 m away