groundranger
Historic · latest filing Jan 2025Commercial

2800 N Terminal Rd, B South, Space#20

Houston, TX 77032 · Iah Terminal B South

Terminal B South bar space renovation at IAH

A 1,459-square-foot interior renovation is planned for The Line Sports Grill’s Center Bar space in IAH Terminal B South. The TDLR project registration was filed January 14, 2025, and lists a fabricated millwork bar and canopy, furniture, lighting, bar equipment, and architectural finishes. The applicant’s estimated project cost is $1,407,000.

Summarized from Texas Department of Licensing and Regulation records · updated Jan 14, 2025

Projects
1
1 filings
Latest filing
Jan 14, 2025
since Jan 14, 2025
Largest scope
1,459 sf
Estimated cost
$1.4M
state registration

Where this project stands

Completed

The Line Sports Grill- Center Bar

1,459 sq ft · $1.4M est.

  1. RegisteredJan 14, 2025
  2. Plan review
  3. ConstructionFeb '25 – Apr '25
  4. Inspected
  5. Closed

Ran as a 2-month build.

4 contacts on this project · 4 phone numbers

Permit & project history

1 project
  1. Interior renovation to an exist. tenant space in terminal b south concourse. the scope will include a fabricated millwork bar and canopy, furniture, lighting, bar equipment, and architectural finishes. project served by exist. terminal restrooms. — iah terminal b south

    TDLR project registrationRenovation/AlterationProject Closed1,459 sq ft$1.4M est.
    Tenant / owner
    The Line Sports Grill- Center Bar
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2800 N Terminal Rd, B South, Space#20

What is being built at 2800 N Terminal Rd, Space 20?

A 1,459-square-foot interior renovation is registered for The Line Sports Grill’s Center Bar tenant space in Terminal B South at IAH. The TDLR filing is dated January 14, 2025.

Is a new bar opening in IAH Terminal B South?

The record describes renovation of an existing tenant space for The Line Sports Grill’s Center Bar. It does not provide an opening date.

What work is planned for The Line Sports Grill Center Bar?

The registered scope includes a fabricated millwork bar and canopy, furniture, lighting, bar equipment, and architectural finishes. The space is served by existing terminal restrooms.

How much is the Terminal B South bar renovation expected to cost?

The TDLR registration lists an applicant-estimated project cost of $1,407,000. This is an estimate, not a confirmed final cost.

When was the Center Bar renovation registered?

The TDLR project registration was filed January 14, 2025. The record lists the project status as closed.

Where is the bar renovation near George Bush Intercontinental Airport?

It is at 2800 N Terminal Rd, South Concourse, Space 20, in Terminal B at George Bush Intercontinental Airport.

Also being built nearby

All of 77032

More restaurants in 77032.

Get alerts for 2800 N Terminal Rd, B South, Space#20