groundranger
Historic · latest filing Apr 2025Commercial

2800 North Terminal Road

Houston, TX 77032 · Houston Airport System – Terminal A Tsa North Check Point Lane Expansion Project, Apm Rehabilitation Phase 1 + 2 more

Airport checkpoint and APM renovations at 2800 N Terminal Road

Renovations are planned at George Bush Intercontinental Airport, including an additional TSA checkpoint lane in Terminal A and rehabilitation of the passenger mover track connecting Terminals A and D/E. TDLR registrations for the checkpoint work and APM rehabilitation were filed on April 14 and February 17, 2025, respectively.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 14, 2025

Projects
4
4 filings
Latest filing
Apr 14, 2025
since May 9, 2024
Largest scope
300,000 sf
Estimated cost
$15M
state registration

Where this project stands

Finishing up · inspection next

Houston Airport System – Terminal A TSA North Check Point Lane Expansion Project

1,125 sq ft · $303K est.

  1. RegisteredApr 14, 2025
  2. Plan review
  3. ConstructionApr '25 – May '25
  4. Inspectednow
  5. Closed

Scheduled to finish May 26, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 1 phone number

Permit & project history

4 projects
  1. Renovation of existing north check point area. removal of existing glass partitions and by-pass vestibule. install additional full check point lane with associated equipment. — houston airport system terminal a

    TDLR project registrationRenovation/AlterationReview Complete1,125 sq ft$303K est.
    Tenant / owner
    Houston Airport System – Terminal A Tsa North Check Point Lane Expansion Project
    Design firm
    Pro
    Contact
    Pro
  2. Structure rehabilitation of about 1.2 miles in track length, connecting terminal a to terminal d/e as well as terminals repairs. — george bush intercontinental airport (iah)

    TDLR project registrationRenovation/AlterationProject Registered300,000 sq ft$15M est.
    Tenant / owner
    Apm Rehabilitation Phase 1
    Design firm
    Pro
    Contact
    Pro
  3. Install (4) new equipment charging stations on housekeeping pads with vertical post for mounting electrical conduits adjacent to walkway. — iah terminal a

    TDLR project registrationRenovation/AlterationProject Closed400 sq ft$50K est.
    Tenant / owner
    Delta Airlines Terminal A Charging Stations
    Design firm
    Pro
    Contact
    Pro
  4. Removal of interior partition, addition on vct flooring and replacement of doors/threshold to meet code. — iah - united

    TDLR project registrationRenovation/AlterationProject Closed165 sq ft$50K est.
    Tenant / owner
    Terminal B Redevelopment - Processor - Abm
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2800 North Terminal Road

What is being built at 2800 North Terminal Road in Houston?

TDLR registrations describe renovations at the airport, including an additional checkpoint lane in Terminal A and rehabilitation of the passenger mover track between Terminals A and D/E. Other registered work includes charging stations in Terminal A and interior updates in Terminal B.

What's changing near IAH Terminal A?

A project registered April 14, 2025, calls for removing existing glass partitions and a bypass vestibule and installing an additional TSA checkpoint lane with associated equipment. The registration is TABS2025016625.

Is a new TSA checkpoint opening at George Bush Intercontinental Airport?

A TDLR registration describes an additional lane in the existing north checkpoint area of Terminal A. It does not provide an opening date.

What is the APM rehabilitation project at IAH?

The project involves structural rehabilitation along about 1.2 miles of passenger mover track connecting Terminal A to Terminals D/E, as well as terminal repairs. It was registered February 17, 2025, as TABS2025012100.

What's being renovated near IAH Terminal B?

A project registered May 9, 2024, describes removing an interior partition, adding VCT flooring, and replacing doors and thresholds to meet code. The TDLR registration is TABS2024018202.

Are there charging stations being installed near IAH Terminal A?

A project registered July 1, 2024, describes installing four equipment charging stations beside a walkway in Terminal A. The registration is TABS2024022057.

Also being built nearby

All of 77032
Email me when it passes inspection