groundranger
Active · latest filing Oct 2026Commercial

10803 W Lake Houston Pkwy, Houston, TX 77044

Houston, TX 77044 · Generation Park Management District

Two pedestrian crossings planned on West Lake Houston Parkway

A project registered on October 19, 2026, includes two mid-block pedestrian crossings across West Lake Houston Parkway. The scope includes curb ramps, traffic signs and equipment, pavement modifications, striping, and connections to existing sidewalks.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 19, 2026

Projects
1
1 filings
Latest filing
Oct 19, 2026
since Oct 19, 2026
Largest scope
3,200 sf
Estimated cost
$100K
state registration

Where this project stands

In state plan review

Mid-Block Pedestrian Crossings at West Lake Houston Parkway

3,200 sq ft · $100K est.

  1. RegisteredOct 19, 2026
  2. Plan reviewnow
  3. ConstructionNov '26 – Feb '27
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. The scope includes 2 mid-block pedestrian crossings across an existing major thoroughfare, including traffic signs and equipment, curb ramps, pavement modifications, striping, and connection to existing sidewalks. — mid-block pedestrian crossings at west lake houston parkway

    TDLR project registrationRenovation/AlterationProject Registered3,200 sq ft$100K est.
    Tenant / owner
    Mid-Block Pedestrian Crossings At West Lake Houston Parkway
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 10803 W Lake Houston Pkwy, Houston, TX 77044

What is being built at 10803 W Lake Houston Pkwy?

The project registration describes two mid-block pedestrian crossings across West Lake Houston Parkway, with connections to existing sidewalks.

How many pedestrian crossings are planned on West Lake Houston Parkway?

The registered project includes two mid-block crossings.

What work is included in the West Lake Houston Parkway project?

The scope includes curb ramps, traffic signs and equipment, pavement modifications, striping, and connections to existing sidewalks.

When was the West Lake Houston Parkway crossing project registered?

The Texas Department of Licensing and Regulation project registration is dated October 19, 2026. Its project number is TABS2027003921.

Is this a new building at 10803 W Lake Houston Pkwy?

The registration describes alterations for two pedestrian crossings across an existing thoroughfare, not a new building.

What is the estimated cost of the West Lake Houston Parkway project?

The applicant's estimated cost for the project is $100,000.

Email me when plan review is complete