7800 Airport Blvd, Houston, TX 77061
Houston, TX 77061 · Hobby Airport
Hobby Airport plans elevator, escalator and walkway replacements
A project at William P. Hobby Airport will replace seven elevators, four escalators and two moving walkways. The Texas Department of Licensing and Regulation registration was filed January 11, 2024, and lists the project as a renovation/alteration with review complete. The applicant estimates the project cost at $7,530,982.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 11, 2024
- since Jan 11, 2024
- Largest scope
- 3,500 sf
- Estimated cost
- $7.5M
- state registration
Where this project stands
Under constructionHOU Conveyance Modernization Systems PN1013
3,500 sq ft · $7.5M est.
- RegisteredJan 11, 2024
- Plan review
- ConstructionJun '25 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProject includes modernization conveyance systems at hou airport. the conveyance systems include elevators h-1, h-2, h-7, h-11, h-12, h-13, h-14; escalators 1, 3, 4, 5; and moving walks 1 and 2. the conveyance systems will be modernized by replacing — hobby airport
TDLR project registrationRenovation/AlterationReview Complete3,500 sq ft$7.5M est.- Project #
- TABS2024009054
- Tenant / owner
- Hou Conveyance Modernization Systems Pn1013
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7800 Airport Blvd, Houston, TX 77061
What is being built at 7800 Airport Blvd in Houston?
The project is a modernization of existing conveyance systems at Hobby Airport, not a new building. The plans describe replacing seven elevators, four escalators and two moving walkways.
Is Hobby Airport getting new elevators?
A TDLR project registration filed January 11, 2024, describes replacing elevators H-1, H-2, H-7, H-11, H-12, H-13 and H-14 as part of a conveyance-system modernization.
Are escalators and moving walkways being replaced at Hobby Airport?
Yes. The project registration lists escalators 1, 3, 4 and 5 and moving walkways 1 and 2 for replacement.
How much is the Hobby Airport conveyance modernization project estimated to cost?
The applicant's estimate is $7,530,982. This is the estimated cost for the project listed in TDLR registration TABS2024009054.
When was the Hobby Airport elevator and escalator project filed?
The project was filed with the Texas Department of Licensing and Regulation on January 11, 2024. Its listed status is Review Complete.
What is being modernized near the food court at Hobby Airport?
A registered airport project covers replacement of specified elevators, escalators and moving walkways. The project record does not identify a specific work area near the food court.
Also being built nearby
All of 77061- 7800 Airport Blvd Unitsr-7Jun 22, 2017Pga tour shop - space #sr-7 (h-17-063c)
- 7800 Airport Blvd - Conc Level 2 · Houston Hobby AirportAug 8, 2024Chalo kiosk — renovation/alteration — small, freestanding retail kiosk for merchandising travel accessories
- 7800 Airport Blvd · William P. Hobby International AirportJun 21, 2025Southwest airlines hou inflight lounge alterations — renovation/alteration — relocating check-in counter millwork; adding under-carpet wireway; adding one wall mounted television monitor; and touchup wall finishes
- 7800 Airport Blvd Houf-28 · Wlliam P. Hobby Airport (hou)Nov 10, 2026Whataburger — renovation/alteration — renovation of an existing concession shell space into a new qsr in the newly constructed west concourse expansion at william p. hobby airport (hou). scope of work includes new flooring, paint, lighting, ceiling, millwork, equipment, non-structural
- 7800 Airport Blvd Houf-18 · Wlliam P. Hobby Airport (hou)Sep 18, 2024Spindletap — renovation/alteration — new bar within the existing concourse at william p. hobby airport. work includes new floor and ceiling finishes, new bar and bar equipment, new mechanical, electrical, and plumbing equipment as required to accomodate bar equipment
- 7800 Airport Blvd , Houf-16 · Wlliam P. Hobby Airport (hou)Mar 25, 2025Yard house — renovation/alteration — interior tenant alteration of existing restaurant within the existing concourse at william hobby airport. work includes new walls, new floor, finishes, new mechanical, electrical, and plumbing equipment
- 7800 Airport Blvd Houf-09 · Wlliam P. Hobby Airport (hou)Sep 18, 2024Killen's — renovation/alteration — remodeled food service tenant build-out within the existing concourse at william p. hobby airport. work includes new walls, floor, ceiling, finishes, bar and bar equipment, new mechanical, electrical, and plumbing equipment as required to accomodat
- 7800 Airport Rd · Hou William P. Hobby International AirportJan 11, 2024Starbucks — renovation/alteration — interior tenant alteration of a food service space, new finishes, partitions, millwork, food equipment and electrical, plumbing and mechanical work
- 7800 Airport Blvd · William P. Hobby AirportJan 23, 2024Houf-05d (chick-fil-a) — renovation/alteration — int. tenant alteration of exist. restaurant and wall protection added to corridor within the exist. concourse. work includes new walls, new floor, new celing, finishes, new mechanical, elec., and plumb. equipment. no structural modifications to the
- 7800 Airport Blvd, Houf-11 · Wlliam P. Hobby Airport (hou)Jun 19, 2025Landry’s — renovation/alteration — interior tenant alteration of an existing restaurant within the existing concourse at william p. hobby airport. work includes new walls, floor, ceiling, finishes, bar and bar equipment, new mechanical, electrical, and plumbing equipment as required
- 7783 Airport BlvdOct 17, 2022Cell tower antenna & equipment remodel · 69 m away
- 7720 Airport BlvdMay 11, 2020(epr) vehicle exhaust capture system upgrade · 173 m away