13300 Hargrave, Level 4
Houston, TX 77070 · Hmh Medical Office Buildings
800-square-foot public restroom renovation at Hargrave
An 800-square-foot public restroom in the existing Hargrave Building at 13300 Hargrave is being renovated, according to a TDLR project registration filed May 9, 2024. The work includes replacing plumbing and lighting fixtures, floor and wall finishes, and ceiling finishes. The project is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated May 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 9, 2024
- since May 9, 2024
- Largest scope
- 800 sf
- Estimated cost
- $75K
- state registration
Where this project stands
CompletedHMMOB HARGRAVE BUILDING LEVEL 4- PUBLIC TOILET
800 sq ft · $75K est.
- RegisteredMay 9, 2024
- Plan review
- ConstructionJul '24 – Oct '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project800.00 sq ft renovation of existing space, including replacement of all plumbing fixtures, lighting fixtures, floor finishes, wall finishes and ceiling finishes. — houston methodist hargrave buidling
TDLR project registrationRenovation/AlterationProject Closed800 sq ft$75K est.- Project #
- TABS2024018132
- Tenant / owner
- Hmmob Hargrave Building Level 4- Public Toilet
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13300 Hargrave, Level 4
What is being renovated at 13300 Hargrave?
A public restroom on Level 4 of the Hargrave Building is being renovated. The registered work includes replacement of plumbing and lighting fixtures and interior finishes.
When was the Hargrave Building restroom renovation filed?
The TDLR project registration was filed May 9, 2024. It is listed as project TABS2024018132.
How large is the restroom renovation at 13300 Hargrave?
The registered renovation covers 800 square feet of existing space.
How much is the Hargrave restroom renovation estimated to cost?
The TDLR registration lists an estimated project cost of $75,000. This is the applicant's estimate.
Is a new building being built at 13300 Hargrave?
The registration describes a renovation of an existing Level 4 public restroom, not new building construction. The project is listed as closed.
What is being renovated near The Methodist Hospital on Hargrave?
At 13300 Hargrave, the registered work is an 800-square-foot renovation of a public restroom in the Hargrave Building. The registration was filed May 9, 2024.
Also being built nearby
All of 77070- 13300 Hargrave Road · The Methodist HospitalOct 15, 2024Hmwb gme coordinator office renovation — renovation/alteration — renovation to existing office area for new offices and classroom
- 13300 Hargrave Rd · Methodist Hargrave MobApr 8, 202629,806 sq ft re-roof office · 63 m away
- 13325 Hargrave Road · Hr Acquisition Of San Antonio LtdDec 22, 2025Heart care clinic-nw houston pet ct eqpt change — renovation/alteration — 700sf renovation of existing suite clinic space to change pet ct equipment and move one wall · 79 m away
- 13325 Hargrave Rd · Hr Acquisition Of San Antonio LtdAug 13, 2024Hfi assure fertility — renovation/alteration — commercial interior office renovation · 79 m away
- 13325 Hargrave Road · Hr Acquisition Of San Antonio, LtdJan 2, 2024Hargrave ste 100 - pet ct — renovation/alteration — renovation in an existing tenant space, 5,397 sq ft, changing a nuclear stress room to a pet ct room and adjacent control room, total 503 sq ft · 79 m away
- 13221 Dotson Road · Dogan Enterprises LLCJun 9, 2026Dotson condo offices — new construction — construction of four new single-story buildings - 3200sf each no tenant build-out at this time steel buildings with stucco and stone finish, parking areas to support new buildings and existing building onsite · 130 m away
- 13219 Dotson Rd · Dotson Medical CenterJun 10, 2025Houston cardiovascular associates — renovation/alteration — existing space modification · 131 m away
- 13219 Dotson Road · Medical Suite 140#Jan 22, 2025Medical suite 140# — renovation/alteration — first floor build out of a medical office · 131 m away
- 13215 Dotson Road · Dhc Zb Properties LLCMay 29, 2024Willowbrook parking expansion — renovation/alteration — this project is a parking lot renovation that consists of new pavement, new parking striping, new concrete curbs, new landscaping, new cedar wood picket fence dumpster enclosure. no ground up construction to occur · 135 m away
- 13802 Centerfield Drive · Houston Methodist Willowbrook HospitalJun 12, 2026Hmwb centerfield cancer center ct sim — renovation/alteration — replacement of the ct equipment in the ct sim scan room and installation of a full-size ups in electrical room located on level 1 · 228 m away
- 18220 Tomball Pky 1440Jun 1, 20233818 sq ft hosp er remodel & ct equip install sp · 237 m away
- 18220 Tomball Pky 400Feb 26, 202417,363 sq ft medical office remodel · 237 m away