13300 Hargrave Road
Houston, TX 77070 · The Methodist Hospital
Office and classroom renovation at 13300 Hargrave Road
A 3,800-square-foot renovation is planned for an existing office area at the Hargrave Medical Office Building, creating new offices and a classroom. The TDLR project registration was filed on October 15, 2024, and lists an applicant-estimated cost of $800,000; its status is closed.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 15, 2024
- since Oct 15, 2024
- Largest scope
- 3,800 sf
- Estimated cost
- $800K
- state registration
Where this project stands
CompletedHMWB GME Coordinator Office Renovation
3,800 sq ft · $800K est.
- RegisteredOct 15, 2024
- Plan review
- ConstructionDec '24 – Mar '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation to existing office area for new offices and classroom. — hargrave medical office building
TDLR project registrationRenovation/AlterationProject Closed3,800 sq ft$800K est.- Project #
- TABS2025003186
- Tenant / owner
- Hmwb Gme Coordinator Office Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13300 Hargrave Road
What is being built at 13300 Hargrave Road?
A 3,800-square-foot renovation of an existing office area for new offices and a classroom was registered with TDLR on October 15, 2024.
Is a new building going up at 13300 Hargrave Road?
The TDLR registration describes a renovation to existing office space, not a new building. The project status is listed as closed.
What is the project cost at 13300 Hargrave Road?
The TDLR registration lists an applicant-estimated cost of $800,000 for the project. This is an estimate, not a reported final cost.
What is being renovated near Hmh Medical Office Buildings?
At 13300 Hargrave Road, a TDLR-registered project calls for renovating existing office space into new offices and a classroom. The filing date was October 15, 2024.
What is happening near Methodist Hargrave MOB?
The HMWB GME Coordinator Office Renovation project covers 3,800 square feet of existing office space at 13300 Hargrave Road. TDLR lists the project status as closed.
Also being built nearby
All of 77070- 13300 Hargrave, Level 4 · Hmh Medical Office BuildingsMay 9, 2024Hmmob hargrave building level 4- public toilet — renovation/alteration — 800.00 sq ft renovation of existing space, including replacement of all plumbing fixtures, lighting fixtures, floor finishes, wall finishes and ceiling finishes
- 13300 Hargrave Rd · Methodist Hargrave MobApr 8, 202629,806 sq ft re-roof office · 63 m away
- 13325 Hargrave Road · Hr Acquisition Of San Antonio LtdDec 22, 2025Heart care clinic-nw houston pet ct eqpt change — renovation/alteration — 700sf renovation of existing suite clinic space to change pet ct equipment and move one wall · 79 m away
- 13325 Hargrave Rd · Hr Acquisition Of San Antonio LtdAug 13, 2024Hfi assure fertility — renovation/alteration — commercial interior office renovation · 79 m away
- 13325 Hargrave Road · Hr Acquisition Of San Antonio, LtdJan 2, 2024Hargrave ste 100 - pet ct — renovation/alteration — renovation in an existing tenant space, 5,397 sq ft, changing a nuclear stress room to a pet ct room and adjacent control room, total 503 sq ft · 79 m away
- 13221 Dotson Road · Dogan Enterprises LLCJun 9, 2026Dotson condo offices — new construction — construction of four new single-story buildings - 3200sf each no tenant build-out at this time steel buildings with stucco and stone finish, parking areas to support new buildings and existing building onsite · 130 m away
- 13219 Dotson Rd · Dotson Medical CenterJun 10, 2025Houston cardiovascular associates — renovation/alteration — existing space modification · 131 m away
- 13219 Dotson Road · Medical Suite 140#Jan 22, 2025Medical suite 140# — renovation/alteration — first floor build out of a medical office · 131 m away
- 13215 Dotson Road · Dhc Zb Properties LLCMay 29, 2024Willowbrook parking expansion — renovation/alteration — this project is a parking lot renovation that consists of new pavement, new parking striping, new concrete curbs, new landscaping, new cedar wood picket fence dumpster enclosure. no ground up construction to occur · 135 m away
- 13802 Centerfield Drive · Houston Methodist Willowbrook HospitalJun 12, 2026Hmwb centerfield cancer center ct sim — renovation/alteration — replacement of the ct equipment in the ct sim scan room and installation of a full-size ups in electrical room located on level 1 · 228 m away
- 18220 Tomball Pky 1440Jun 1, 20233818 sq ft hosp er remodel & ct equip install sp · 237 m away
- 18220 Tomball Pky 400Feb 26, 202417,363 sq ft medical office remodel · 237 m away