3100 North Terminal Road, Terminal B, Level 3
Houston, TX 77380 · United Airlines - Terminal B
United Airlines plans Terminal B break room renovation
A 3,536-square-foot existing space at United Airlines’ Terminal B is being remodeled into a break room, with new partition walls, ceiling, lights, and millwork. The project was registered with TDLR on December 19, 2024, and the registration lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 19, 2024
- since Dec 19, 2024
- Largest scope
- 3,536 sf
- Estimated cost
- $670K
- state registration
Where this project stands
CompletedTerminal B - FX Breakroom
3,536 sq ft · $670K est.
- RegisteredDec 19, 2024
- Plan review
- ConstructionFeb '25 – Jun '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectInterior renovations for terminal b. remodel of existing space into break room which includes addition of new partition walls, reflected ceiling, lights, and millwork. proposed scope of work does not intend to change any life safety systems. — united airlines - terminal b
TDLR project registrationRenovation/AlterationProject Closed3,536 sq ft$670K est.- Project #
- TABS2025008141
- Tenant / owner
- Terminal B - Fx Breakroom
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3100 North Terminal Road, Terminal B, Level 3
What is being built at 3100 North Terminal Road, Terminal B?
An existing 3,536-square-foot space is being remodeled into a break room for United Airlines’ Terminal B. The scope includes new partition walls, ceiling, lights, and millwork.
When was the Terminal B break room project filed?
The TDLR project registration was filed on December 19, 2024. Its project number is TABS2025008141.
How much will the Terminal B break room renovation cost?
The TDLR registration lists an applicant-estimated project cost of $670,000. This is an estimate, not a reported final cost.
Is the work at IAH Terminal B a new building?
No. The registration describes interior renovations that remodel an existing space into a break room.
What is being renovated near IAH Terminal B South Concourse?
A space at Terminal B is being remodeled into a United Airlines break room. The project registration says the proposed work does not intend to change life safety systems.
Also being built nearby
All of 77380- 3100 N Terminal Rd Tbf-3Feb 2, 2017El real storefront revision- i-17-006c
- 3100 N Terminal Rd New Terminal B N · City Of HoustonSep 18, 2025Cibo express gourmet market- space 9 — renovation/alteration — tenant fit out for a new grab and go market. scope of work includes new equipment, partitions, lighting, mep, finishes, and fire protection system
- 3100 N Terminal Blvd · Iah Terminal BApr 23, 2024Terminal b redovelopment - priority walls — renovation/alteration — new walls and doors for new boh rooms. steel fireproofing, extension to existing stairs, thermal insulation, and wall rough in for prep for future work electrical, telecom/security installation
- 3100 North Terminal Road · City Of Houston – Houston Airport System DivisionJun 5, 2026Iah ual vrct expansion — additions to existing building — new virtual ramp control tower and associated support spaces at the north end of the the west concourse of terminal b north. installation of mechanical, electrical, plumbing and telecom equipment in existing mechanical, electrical and telecom rooms
- 3100 N Terminal Rd Terminal B N · City Of HoustonSep 18, 2025Cibo express gourmet market- space 3 — renovation/alteration — tenant fit out for a new grab and go market. scope of work includes new equipment, partitions, lighting, mep, finishes and fire protection systems
- 3100 N Terminal Rd Spaces Bnw-6, Bnw-7, Bnw-7b, Bnw-7c · Houston Airport SystemsApr 29, 2026Bmg concessions fitout (katz coffe, protein bar & kitchen, jersey mike`s, and smash burger) — renovation/alteration — tenant fitout in new terminal addition for four (4) tenant spaces and general access seating area. tenant operators include katz coffee, protein bar, jersey mikes & smash burger
- 3100 N Terminal Rd Tbr-8Apr 10, 2018Rocky mountain candy factory interior remodel (i-18-021t)
- 3100 N Terminal Road · Iah - Terminal B South ConcourseJun 20, 2025Ua-- tbt terminal b south concourse - en-34 b south transfer pax b4 & b5 — renovation/alteration — gate b4 & b5 apron re-striping and equipment relocation for terminal b-c bus transfer
- 3100 N Terminal Rd Space Bne-15 · George Bush Intercontinental AirportApr 27, 2026Sky market — renovation/alteration — tenant finish out of an existing lease space. improvements shall include complete finish out of the interior to include new non-load bearing walls, ceiling, floor finishes, millwork, seating, structural, mechanical, electrical, and plumbing
- 3100 N Terminal Rd. Space · Houston Airport SystemsMar 12, 2026Rocky mountain chocolate factory and blue bell — renovation/alteration — tenant finish out of an existing lease space. improvements shall include complete finish out of the interior to include new non-load bearing walls, ceiling, floor finishes, millwork, seating, structural, mechanical, electrical and plumbing
- 3100 N Terminal BNov 15, 2018United airlines pc air and gpu replacement/terminal b (i-18-136t)
- 3100 N Terminal Rd Space Bn-8 · Houston Airport SystemsMar 24, 2026Inmotion / tumi — renovation/alteration — interior buildout of a 1,071 sq ft retail tenant space in terminal b at iah, including non-load bearing partitions, interior finishes, and associated mechanical and electrical work