L3W at 7800 Washington
Washington Avenue Coalition / Memorial Park · 77007 · Harris County
Class 2 subdivision plat filed for 7800 Washington
A Class 2 subdivision plat application covers 4.799 acres at 7800 Washington in Houston. The application, filed by Levcor, Inc., was listed for Planning Commission review on November 10, 2022; the records provided do not state its status or describe a building project.
- Lots
- —
- Acres
- 4.80
- Next / last hearing
- Nov 10, 2022
- School district
- Houston ISD
Application
Planning Commission history
- November 10, 2022Listed
Questions about L3W at 7800 Washington
What is being built at 7800 Washington?
The available record describes a Class 2 subdivision plat application for 4.799 acres, not a specific building or use. It does not provide construction details.
What is the project at 7800 Washington in Houston?
The record lists application 2022-2621, a Class 2 subdivision plat for the subdivision named L3W at 7800 Washington. It was listed for Planning Commission review on November 10, 2022.
How many acres are included in the 7800 Washington plat?
The application covers 4.799 acres in ZIP code 77007.
Who filed the 7800 Washington subdivision plat?
The listed developer is Levcor, Inc., and Pape-Dawson Engineers is listed as the engineer or surveyor.
What does unrestricted land use mean for 7800 Washington?
The application lists the land use as unrestricted. The record does not specify a proposed building, tenant, or business.
Was the 7800 Washington subdivision plat approved?
The record lists the application for Planning Commission review on November 10, 2022, but does not provide a status or approval outcome.
Other plats in 77007
- Thompson HeightsDec 3, 20261 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- RPS Estates at Crockett StreetDec 3, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Blossom GroveNov 12, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Houston Avenue SquareOct 15, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Maxroys CornerSep 17, 20263 lots · 0.11 ac · Single Family Residential (Shared Driveways) · Washington Avenue Coalition / Memorial Park
- Floyd Street ViewsSep 3, 20262 lots · 0.13 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Houston Residences ParkSep 3, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Homes at Rutland StreetAug 20, 20262 lots · 0.15 ac · Single Family Residential (Public Street) · Greater Heights
Commercial construction in 77007
- 7811 Burleson Rd · Hci Rbp Owner LLCOct 29, 2026Ross business park - building 02 - spec office — renovation/alteration — the scope of work includes a 2,580 sq ft speculative office space build within an existing warehouse space, warehouse lighting, and addition of two dock levelers. total building area is 108,989 sq ft
- 12300 North Freeway · Reep-Ind Citynorth Owner TX LLCOct 27, 2026Greenspoint north — new construction — construction of a new ground-up vacant shell warehouse building. site improvements will be made for a future tenant. the building will be designed with adequate fire department access and fire protection req.s for high piled storage
- 424 E 4th St · Fila PropertiesOct 26, 2026Parking lot light install
- 600 N Shepherd Dr · Popup Bagels MktOct 26, 20261,185 sq ft convert to take out bagel shop 100% sp
- 621 Waverly St · Strong PilatesOct 20, 20262,542 sq ft buildout pilates studio demise
- 8200 Washington Avenue · 8200 Washington Purchase LLCOct 20, 2026Tempo washington - indoor buildout and five outdoor padel courts — renovation/alteration — approx. 2,000 sq ft padel clubhouse and cafe buildout with retail, lounge, storage, restrooms and showers; five outdoor padel courts with foundations, lighting, deck, walkways and drainage/site work. approx. 18,000 sq ft affected