groundranger
Plat 2023-0285Water Treatment, Production or Repressurization

Harris County MUD No 150 Water Plant No 1

Houston · 77067 · Harris County

Plat filed for Harris County MUD 150 water plant site

A Class 2 subdivision plat covers a 1.05-acre site designated for water treatment, production or repressurization in Harris County. The record lists a planning commission date of February 16, 2023, and identifies Harris County MUD No. 150 as the developer.

Lots
—
Acres
1.05
Next / last hearing
Feb 16, 2023
School district
Spring ISD

Application

TypeClass 2 subdivision plat
DeveloperHarris County MUD No 150
Engineer / surveyorBGE, Inc.
SubmittedFebruary 6, 2023

Planning Commission history

  1. February 16, 2023Listed

Questions about Harris County MUD No 150 Water Plant No 1

What is being planned at Harris County MUD No. 150 Water Plant No. 1?

A Class 2 subdivision plat covers a 1.05-acre site designated for water treatment, production or repressurization. The record does not provide construction details.

Was a building permit issued for the water plant?

The available record is a Class 2 subdivision plat application, not a building permit. It lists a planning commission date of February 16, 2023.

When was the Harris County MUD 150 plat considered?

The record lists February 16, 2023, as the planning commission date for application 2023-0285.

How large is the Harris County MUD No. 150 Water Plant No. 1 site?

The Class 2 subdivision plat record lists the site as 1.05 acres.

Who is the developer for Harris County MUD No. 150 Water Plant No. 1?

The record names Harris County MUD No. 150 as the developer and BGE, Inc. as the engineer or surveyor.

What is the application number for the Harris County MUD 150 water plant plat?

The application number is 2023-0285. It is listed as a Class 2 subdivision plat.

Where is the Harris County MUD No. 150 water plant site?

The record places the site in Harris County, ZIP code 77067, within Spring ISD.

Other plats in 77067

Commercial construction in 77067