Final plat filed for MUD 58 Water Plant No. 2 and extension

A 1.308-acre final plat application describes a water treatment, production or repressurization site for Fort Bend County MUD 58. The application, number 2024-1974, was listed for planning commission consideration on October 17, 2024; the records do not state a construction schedule.

Lots
—
Acres
1.31
Next / last hearing
Oct 17, 2024
School district
Katy ISD

Application

TypeClass 3 subdivision final plat
DeveloperFort Bend County MUD 58
Engineer / surveyorCostello, Inc.
SubmittedOctober 4, 2024

Planning Commission history

  1. October 17, 2024Listed

Questions about Fort Bend County Municipal Utility District no 58 Water Plant no 2 and extension

What is planned for Fort Bend County MUD 58 Water Plant No. 2?

Application 2024-1974 describes a 1.308-acre site for water treatment, production or repressurization. It is a final plat application, not a construction permit.

Where is the MUD 58 Water Plant No. 2 project?

The record places it in Fort Bend County, ZIP code 77494. It does not provide a street address.

When was the MUD 58 Water Plant No. 2 plat considered?

The planning commission date listed for final plat application 2024-1974 is October 17, 2024.

Who is developing the MUD 58 Water Plant No. 2 site?

The application names Fort Bend County MUD 58 as the developer and Costello, Inc. as the engineer or surveyor.

How large is the MUD 58 Water Plant No. 2 site?

The final plat application describes a site of 1.308 acres.

When will construction start on the MUD 58 water plant?

The available record lists a final plat application considered on October 17, 2024, but does not give a construction start date.