groundranger
Plat 2025-0404Water Treatment, Production or Repressurization

Paloma Water Plant Site

Houston · 77484 · Harris County

Paloma Water Plant site replat covers 1.192 acres

A Class 2 subdivision replat for the Paloma Water Plant Site covers 1.192 acres designated for water treatment, production or repressurization. The planning commission date listed for application 2025-0404 is March 20, 2025.

Lots
—
Acres
1.19
Next / last hearing
Mar 20, 2025
School district
—

Application

TypeClass 2 subdivision replat
DeveloperCENTURY LAND HOLDINGS OF TEXAS, LLC
Engineer / surveyorCostello, Inc.
SubmittedFebruary 24, 2025

Planning Commission history

  1. March 20, 2025Listed

Questions about Paloma Water Plant Site

What is planned for the Paloma Water Plant Site?

Application 2025-0404 is a Class 2 subdivision replat for a site designated for water treatment, production or repressurization. The records do not specify a particular construction project.

Where is the Paloma Water Plant Site?

The site is in ZIP code 77484 in Harris County. The fact sheet does not provide a street address.

How large is the Paloma Water Plant Site replat?

The replat covers 1.192 acres.

When was the Paloma Water Plant Site application reviewed?

The planning commission date listed for application 2025-0404 is March 20, 2025.

Who is the developer for the Paloma Water Plant Site?

The developer listed for the application is CENTURY LAND HOLDINGS OF TEXAS, LLC.

What type of application is 2025-0404?

It is a Class 2 subdivision replat for the Paloma Water Plant Site.

Other plats in 77484

Commercial construction in 77484