groundranger
Plat 2025-0505Water Treatment, Production or Repressurization

Harris County MUD 144 Water Plant no 1

Houston · 77449 · Harris County

Final plat filed for Harris County MUD 144 water plant

A 2.6725-acre final plat for Harris County MUD 144 Water Plant No. 1 is recorded as a Class 3 subdivision application for water treatment, production or repressurization. The application, number 2025-0505, was on the planning commission calendar for March 20, 2025.

Lots
—
Acres
2.67
Next / last hearing
Mar 20, 2025
School district
Cypress-Fairbanks ISD

Application

TypeClass 3 subdivision final plat
DeveloperHC MUD 144
Engineer / surveyorMcKim and Creed
SubmittedMarch 10, 2025

Planning Commission history

  1. March 20, 2025Listed

Questions about Harris County MUD 144 Water Plant no 1

What is being built at Harris County MUD 144 Water Plant No. 1?

The subdivision application identifies the site’s land use as water treatment, production or repressurization. It is a 2.6725-acre final plat application, not a building permit.

Where is the Harris County MUD 144 water plant?

The project is listed in Harris County, ZIP code 77449. The fact sheet does not provide a street address.

Has the Harris County MUD 144 water plant final plat been approved?

The application was on the planning commission calendar for March 20, 2025, but the available record does not state an approval status.

What is the application number for Harris County MUD 144 Water Plant No. 1?

The Class 3 subdivision final plat application number is 2025-0505.

Who is developing the Harris County MUD 144 water plant?

The developer listed for the application is HC MUD 144. McKim and Creed is listed as the engineer or surveyor.

How large is the Harris County MUD 144 water plant site?

The final plat application covers 2.6725 acres.

Which school district serves the Harris County MUD 144 water plant site?

The project record lists Cypress-Fairbanks ISD.

Other plats in 77449

Commercial construction in 77449