groundranger
Plat 2025-0598Water Treatment, Production or Repressurization

Fort Bend County MUD no 24 Water Plant no 1

Houston · 77053 · Fort Bend County

Plat filed for Fort Bend County MUD 24 water plant site

A 2.36-acre site is designated for water treatment, production or repressurization in the Fort Bend County MUD No. 24 Water Plant No. 1 subdivision plat. The Class 2 plat application, number 2025-0598, lists a planning commission date of April 3, 2025.

Lots
—
Acres
2.36
Next / last hearing
Apr 3, 2025
School district
Fort Bend ISD

Application

TypeClass 2 subdivision plat
DeveloperFBMUD24
Engineer / surveyorLJA Engineering, Inc.- (Houston Office)
SubmittedMarch 24, 2025

Planning Commission history

  1. April 3, 2025Listed

Questions about Fort Bend County MUD no 24 Water Plant no 1

What is planned for Fort Bend County MUD No. 24 Water Plant No. 1?

The subdivision plat lists the 2.36-acre site for water treatment, production or repressurization. The record does not provide more detail about the proposed facilities.

Where is the Fort Bend County MUD 24 water plant site?

The record places the site in Fort Bend County, ZIP code 77053. It does not provide a street address.

Has construction been permitted for the Fort Bend County MUD 24 water plant?

The record is for a Class 2 subdivision plat, application 2025-0598. It does not list a construction permit.

When was the Fort Bend County MUD 24 water plant plat considered?

The record lists April 3, 2025, as a planning commission date. It does not provide a status or outcome.

Who is listed on the Fort Bend County MUD 24 water plant plat?

FBMUD24 is listed as the developer, and LJA Engineering, Inc. (Houston Office) is listed as the engineer or surveyor.

Other plats in 77053

Commercial construction in 77053