Reserve at Aqueduct: 5-acre subdivision plat submitted
A preliminary plat for the 5-acre, unrestricted Reserve at Aqueduct subdivision was submitted under application 2026-1672. The application is listed as submitted, not approved, and names DVJ GROUP as the engineer or surveyor.
- Lots
- —
- Acres
- 5.00
- Next / last hearing
- Dec 3, 2026
- School district
- Sheldon ISD
Application
TypeClass 3 subdivision preliminary plat (C3P)
DeveloperN/A
Engineer / surveyorDVJ GROUP
Council districtE
SubmittedOctober 16, 2026
Planning Commission history
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Listed
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Listed
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- December 3, 2026Submitted
Questions about Reserve at Aqueduct
What is being proposed at Reserve at Aqueduct?
A preliminary plat has been submitted for a 5-acre subdivision called Reserve at Aqueduct. The application describes the land use as unrestricted.
Has the Reserve at Aqueduct subdivision been approved?
The application status is listed as Submitted. The records provided do not show an approval.
What is the application number for Reserve at Aqueduct?
The preliminary plat application number is 2026-1672.
Where is Reserve at Aqueduct located?
The subdivision is listed in Harris County ZIP code 77044.
How large is the Reserve at Aqueduct site?
The preliminary plat application lists the site as 5 acres.
Which school district serves Reserve at Aqueduct?
The application lists Sheldon ISD as the school district.
Other plats in 77044
- Lakeside Terrace EnclaveDec 3, 20262 lots · 0.95 ac · Single Family Residential (PAE 1/PAE 2) · Lake Houston
- Generation Park East Sec 8Dec 3, 202641.27 ac · Unrestricted · 77044
- Generation Park South Sec 3Dec 3, 20269.09 ac · Unrestricted; Lift Station · 77044
- Reserve at North Lake HoustonDec 3, 202610.00 ac · Unrestricted · 77044
- Generation Park East Sec 5Dec 3, 2026500.70 ac · Unrestricted · 77044
- Generation Park East Sec 2Dec 3, 2026238.53 ac · Unrestricted; Landscape or Open Space · 77044
- Anchor Liberty ChannelOct 29, 202672.42 ac · Unrestricted · 77044
Commercial construction in 77044
- 13460 Lockwood Drive · Ftitx001 LLCNov 5, 2026Technip fmc racking — renovation/alteration — installation of storage racks in existing warehouse
- 0 Common Dock · Mitsubishi Power Americas, INCOct 28, 2026Mitsubishi power — new construction — build a new industrial office/training/shop building of pre-engineered metal & steel frame with tilt-wall construction, and parking lot
- 12550 Timber Forest Drive · Eli Lilly And CompanyOct 26, 2026Lilly houston campus — new construction — exterior shell package only. interior build out to be submitted separately
- 14315 E Sam Houston Pkwy N · Lake Houston Beltway Associates LLCOct 26, 2026Results physiotherapy - atascocita — renovation/alteration — tenant buildout of suite in an existing tenant building
- 12190 N Lake Houston Pkwy Houston, TX 77044 · Northlake DevelopmentOct 21, 2026Northlake development — new construction — construction of (1) 158,040 sq ft one story tilt wall building with associated site work
- 10803 W Lake Houston Pkwy, Houston, TX 77044 · Generation Park Management DistrictOct 19, 2026Mid-block pedestrian crossings at west lake houston parkway — renovation/alteration — the scope includes 2 mid-block pedestrian crossings across an existing major thoroughfare, including traffic signs and equipment, curb ramps, pavement modifications, striping, and connection to existing sidewalks