24403 E Lake Houston Pkwy, Huffman, TX 77336
Huffman, TX 77336 · Huffman Independent School District
Huffman Elementary School roof renovation
Huffman Elementary School’s roof was scheduled for renovation under a project registration filed May 20, 2024. The work includes removing the existing gravel roof and installing a modified bitumen roofing system, along with repairs to plaster walls and skylights. The TDLR-listed estimated project cost is $1.825 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 20, 2024
- since May 20, 2024
- Largest scope
- 110,000 sf
- Estimated cost
- $1.8M
- state registration
Where this project stands
CompletedHuffman Elementary School Re-Roof Package
110,000 sq ft · $1.8M est.
- RegisteredMay 20, 2024
- Plan review
- ConstructionJul '24 – Oct '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectSweep and removal of existing gravel roof. overlay existing roof with new modified bitumen roofing system with 20-year ndl warranty. patch, repair, and coat existing plaster walls. clean existing skylights and seal with clear coating. — huffman elementary school
TDLR project registrationRenovation/AlterationProject Closed110,000 sq ft$1.8M est.- Project #
- TABS2024018869
- Tenant / owner
- Huffman Elementary School Re-Roof Package
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 24403 E Lake Houston Pkwy, Huffman, TX 77336
What is being built at 24403 E Lake Houston Pkwy?
A TDLR project registration covers a roof renovation at Huffman Elementary School, not a new building. The listed work includes a new modified bitumen roofing system, plaster wall repairs, and skylight cleaning and sealing.
When was the Huffman Elementary School roof project filed?
The project registration was filed May 20, 2024. Its TDLR project number is TABS2024018869.
What work is included in the Huffman Elementary School roof renovation?
The scope calls for removing the existing gravel roof and overlaying it with a modified bitumen roofing system. It also includes patching, repairing, and coating plaster walls, and cleaning and sealing existing skylights.
How much is the Huffman Elementary School roof project estimated to cost?
The TDLR registration lists an estimated project cost of $1.825 million. This is the applicant’s estimate for the project.
Is the Huffman Elementary School roof project still underway?
The TDLR record lists the project status as closed. The registration was filed May 20, 2024.
Also being built nearby
All of 77336- 24403 E Lake Houston Pkwy · Huffman Independent School DistrictJul 20, 2026Huffman elementary school mep upgrades — renovation/alteration — interior renovation of selected existing classrooms, corridors, and restrooms including new and replacement of mechanical, electrical, and plumbing, lighting, and technology systems with miscellaneous mep upgrades throughout the school
- 24403 E Lake Houston PkyMay 23, 2017(epr) 190 sq ft school vestibule remodel
- 24405 E Lake Houston PkyMay 23, 2017(epr) school vestibule remodel 100% · 6 m away
- 531 Broadripple DrMar 7, 2019Residential repairs · 192 m away
- 24103 Shin Oak DrOct 8, 2025Residential repair per spec list · 213 m away
- 24213 Shellbrook DrJul 5, 2019Residential repair per spec list · 224 m away
- 24203 Shellbrook DrMar 21, 2017New single-family residence with attached garage · 231 m away
- 702 Cherry Valley DrNov 4, 2025Residential new solar panel · 232 m away
- 24043 Shin Oak DrSep 30, 2020Residential (28) roof mounted solar panels 2102 · 269 m away
- 523 Fallcreek DrOct 16, 2018Residential foundation repairs · 274 m away
- 530 Fall Creek Dr · Asmus Homes LLCMay 21, 2026Single-family residence with attached garage · 287 m away
- 702 Fall Creek DrNov 2, 2023Residential house elevation · 292 m away