groundranger
Historic · latest filing May 2024Commercial

24403 E Lake Houston Pkwy, Huffman, TX 77336

Huffman, TX 77336 · Huffman Independent School District

Huffman Elementary School roof renovation

Huffman Elementary School’s roof was scheduled for renovation under a project registration filed May 20, 2024. The work includes removing the existing gravel roof and installing a modified bitumen roofing system, along with repairs to plaster walls and skylights. The TDLR-listed estimated project cost is $1.825 million.

Summarized from Texas Department of Licensing and Regulation records · updated May 20, 2024

Projects
1
1 filings
Latest filing
May 20, 2024
since May 20, 2024
Largest scope
110,000 sf
Estimated cost
$1.8M
state registration

Where this project stands

Completed

Huffman Elementary School Re-Roof Package

110,000 sq ft · $1.8M est.

  1. RegisteredMay 20, 2024
  2. Plan review
  3. ConstructionJul '24 – Oct '24
  4. Inspected
  5. Closed

Ran as a 3-month build.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Sweep and removal of existing gravel roof. overlay existing roof with new modified bitumen roofing system with 20-year ndl warranty. patch, repair, and coat existing plaster walls. clean existing skylights and seal with clear coating. — huffman elementary school

    TDLR project registrationRenovation/AlterationProject Closed110,000 sq ft$1.8M est.
    Tenant / owner
    Huffman Elementary School Re-Roof Package
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 24403 E Lake Houston Pkwy, Huffman, TX 77336

What is being built at 24403 E Lake Houston Pkwy?

A TDLR project registration covers a roof renovation at Huffman Elementary School, not a new building. The listed work includes a new modified bitumen roofing system, plaster wall repairs, and skylight cleaning and sealing.

When was the Huffman Elementary School roof project filed?

The project registration was filed May 20, 2024. Its TDLR project number is TABS2024018869.

What work is included in the Huffman Elementary School roof renovation?

The scope calls for removing the existing gravel roof and overlaying it with a modified bitumen roofing system. It also includes patching, repairing, and coating plaster walls, and cleaning and sealing existing skylights.

How much is the Huffman Elementary School roof project estimated to cost?

The TDLR registration lists an estimated project cost of $1.825 million. This is the applicant’s estimate for the project.

Is the Huffman Elementary School roof project still underway?

The TDLR record lists the project status as closed. The registration was filed May 20, 2024.

Also being built nearby

All of 77336

More schools & daycares in 77336.

Get alerts for 24403 E Lake Houston Pkwy, Huffman, TX 77336