121 Royal Oak Ln
Lakeway, TX 78734
Electrical service and panel upgrade at 121 Royal Oak Ln
An electrical permit filed April 23, 2026, covers work at the home, including replacing the garage electrical panel and updating the meter and grounding system. The permit also describes adding an exterior breaker disconnect and surge protection; its status is Final.
Summarized from City of Austin records · updated Apr 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 23, 2026
- since Apr 23, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect and reconnect. trutec will be replacing the sylvania panel in the garage we will be adding a enclosed breaker disconnect on the outside of the home and updating the meter can as well as adding surge protection and a new grounding system
- AppliedApr 21, 2026
- IssuedApr 23, 2026
- WorkApr '26 – May '26
- Final inspectionMay 7, 2026
Passed final inspection May 7, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRequest to disconnect and reconnect. trutec will be replacing the sylvania panel in the garage we will be adding a enclosed breaker disconnect on the outside of the home and updating the meter can as well as adding surge protection and a new grounding system
Request to disconnect and reconnect. trutec will be replacing the sylvania panel in the garage we will be adding a enclosed breaker disconnect on the outside of the home and updating the meter can as well as adding surge protection and a new grounding system
City of Austin permitElectrical PermitFinal- Record
- 2026-049186 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 121 Royal Oak Ln
What work is being done at 121 Royal Oak Ln?
Permit 2026-049186 EP describes replacing the garage electrical panel, adding an exterior enclosed breaker disconnect, updating the meter can, and adding surge protection and a new grounding system.
When was the electrical permit filed for 121 Royal Oak Ln?
The City of Austin permit was filed April 23, 2026.
Is permit 2026-049186 EP for a new home?
No. The permit describes electrical work at an existing home, including a panel replacement and service updates.
What is the status of the electrical permit at 121 Royal Oak Ln?
City of Austin permit 2026-049186 EP has a status of Final.
Is the garage electrical panel being replaced at 121 Royal Oak Ln?
Yes. The permit describes replacing the garage panel and adding an enclosed breaker disconnect outside the home.
Does the work at 121 Royal Oak Ln include surge protection?
Yes. The permit description includes surge protection and a new grounding system.
Also being built nearby
All of 78734- 1906 Lakeway BlvdOct 15, 2024Request to disconnect - installation of 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type ii surge protection · 188 m away
- 101 Fenway CtJun 27, 2025Disconnect/reconnect replace 200a main panel and install 24kw generator · 227 m away
- 502 Duck Lake DrFeb 7, 2025Install new roof-mounted solar and energy storage system to existing single family residence. ae - underground · 277 m away
- 2025 Lakeway BlvdAug 8, 2025*request to disconnect* residential main panel change out: replace obsolete 200a mcb sylvania zinsco type electrical panel and breakers with new manufactured equipment. no changes to load · 360 m away
- 2104 Lakeway BlvdSep 24, 2024320 amps electrical service upgrade · 368 m away
- 705 Duck Lake DrNov 6, 2026Base: installing a backup battery system and additional meter socket · 409 m away
- 706 Rolling Green DrJan 16, 2024Upgrade service on home · 428 m away
- 613 Rolling Green DrSep 2, 2025Swapping out old federal pacific panel · 469 m away
- 703 Show Low CtJul 17, 2025Utility disconnect/reconnect. tesla backup switch. underground service. ae. meter can does not need replacing- no espa attached · 491 m away
- 904 Palos Verdes DrAug 4, 2026Temp power pole · 493 m away
- 405 Duck Lake DrOct 1, 2026Etj. new service for sfr · 527 m away
- 719 Twin Hills CtApr 18, 2024Upgrade electrical service from a 600amp to a 600amp with a transfer switch · 565 m away