904 Palos Verdes Dr
Lakeway, TX 78734
Temporary power pole permitted at 904 Palos Verdes Dr
An electrical permit for a temporary power pole at 904 Palos Verdes Dr was filed on August 4, 2026. The City of Austin permit, 2026-096610 EP, is marked final; the record does not specify what the temporary power will support.
Summarized from City of Austin records · updated Aug 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2026
- since Aug 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTemp power pole
- AppliedJul 27, 2026
- IssuedAug 4, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 19, 2026
Passed final inspection Aug 19, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTemp power pole
Temp power pole
City of Austin permitElectrical PermitFinal- Record
- 2026-096610 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 904 Palos Verdes Dr
What is being built at 904 Palos Verdes Dr?
The permit record describes a temporary power pole, but it does not identify a building or other project it will support.
What permit was filed for 904 Palos Verdes Dr?
City of Austin electrical permit 2026-096610 EP is for a temporary power pole.
When was the permit for 904 Palos Verdes Dr filed?
The permit was filed on August 4, 2026.
Is the permit for 904 Palos Verdes Dr final?
Yes. The City of Austin record lists permit 2026-096610 EP as final.
Does the permit say a new home is being built at 904 Palos Verdes Dr?
No. The record only describes a temporary power pole and does not specify the purpose of the power.
Also being built nearby
All of 78734- 502 Duck Lake DrFeb 7, 2025Install new roof-mounted solar and energy storage system to existing single family residence. ae - underground · 221 m away
- 101 Tamarac CtFeb 5, 2026Install new 18.705kw rooftop solar system for existing residential only · 270 m away
- 101 Fenway CtJun 27, 2025Disconnect/reconnect replace 200a main panel and install 24kw generator · 281 m away
- 405 Duck Lake DrOct 1, 2026Etj. new service for sfr · 351 m away
- 121 Clubhouse DrApr 6, 2026Permanent electrical service for new sfr in etj · 366 m away
- 705 Duck Lake DrNov 6, 2026Base: installing a backup battery system and additional meter socket · 371 m away
- 108 Kerry CtNov 10, 2026Spot closed 12/3/25 - temporary power pole for use during construction of new home. 11/10/26 cm re-activating permit due to feeders being inverted in meter can ( line side installed on bottom lugs) · 432 m away
- 408 Palos Verdes DrSep 21, 2026Emergency upgrade of existing 200amp underground service with new panel and meter like for like · 453 m away
- 103 Palos Verdes DrNov 18, 2026Base: installing a backup battery system and additional meter socket · 463 m away
- 213 Palos Verdes DrOct 30, 2026Base: installing a backup battery system and additional meter socket · 472 m away
- 209 Palos Verdes DrOct 23, 2026Etj - install/replace 200 amp main breaker panel and meter can (underground) · 478 m away
- 121 Royal Oak LnApr 23, 2026Request to disconnect and reconnect. trutec will be replacing the sylvania panel in the garage we will be adding a enclosed breaker disconnect on the outside of the home and updating the meter can as well as adding surge protection and a new grounding system · 493 m away