209 Palos Verdes Dr
Lakeway, TX 78734
Electrical service work permitted at 209 Palos Verdes Dr
An electrical permit covers installing or replacing a 200-amp main breaker panel and underground meter can at 209 Palos Verdes Dr. The City of Austin permit was filed October 23, 2026, and its status is Final.
Summarized from City of Austin records · updated Oct 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 23, 2026
- since Oct 23, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEtj - install/replace 200 amp main breaker panel and meter can (underground)
- AppliedOct 19, 2026
- IssuedOct 23, 2026
- WorkOct '26 – Nov '26
- Final inspectionNov 2, 2026
Passed final inspection Nov 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEtj - install/replace 200 amp main breaker panel and meter can (underground)
Etj - install/replace 200 amp main breaker panel and meter can (underground)
City of Austin permitElectrical PermitFinal- Record
- 2026-137568 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 209 Palos Verdes Dr
What work is permitted at 209 Palos Verdes Dr?
The permit covers installing or replacing a 200-amp main breaker panel and an underground meter can. It is City of Austin permit 2026-137568 EP, filed October 23, 2026.
Is a new home being built at 209 Palos Verdes Dr?
The available record is for electrical service work, not a new-home construction permit. It covers a 200-amp main breaker panel and underground meter can.
When was the electrical permit filed for 209 Palos Verdes Dr?
City of Austin permit 2026-137568 EP was filed October 23, 2026.
Is the permit for 209 Palos Verdes Dr approved?
The City of Austin record lists permit 2026-137568 EP as Final.
What size electrical panel is planned at 209 Palos Verdes Dr?
The permit description specifies a 200-amp main breaker panel and an underground meter can.
Also being built nearby
All of 78734- 213 Palos Verdes DrOct 30, 2026Base: installing a backup battery system and additional meter socket · 56 m away
- 103 Palos Verdes DrNov 18, 2026Base: installing a backup battery system and additional meter socket · 218 m away
- 405 Duck Lake DrOct 1, 2026Etj. new service for sfr · 232 m away
- 307 Palos Verdes DrOct 24, 2024Etj new service for sfr · 288 m away
- 408 Palos Verdes DrSep 21, 2026Emergency upgrade of existing 200amp underground service with new panel and meter like for like · 411 m away
- 108 Kerry CtNov 10, 2026Spot closed 12/3/25 - temporary power pole for use during construction of new home. 11/10/26 cm re-activating permit due to feeders being inverted in meter can ( line side installed on bottom lugs) · 420 m away
- 904 Palos Verdes DrAug 4, 2026Temp power pole · 478 m away
- 502 Duck Lake DrFeb 7, 2025Install new roof-mounted solar and energy storage system to existing single family residence. ae - underground · 538 m away
- 101 Fenway CtJun 27, 2025Disconnect/reconnect replace 200a main panel and install 24kw generator · 555 m away
- 104 Cross Creek · City Of LakewayMar 20, 2024Renovation of court clerks area and restrooms — renovation/alteration — the scope of work involves renovating the 2nd floor courts clerk office. it also involves a renovation of the first floor restroom. the existing fixtures on second floor will be removed and replaced with new · 578 m away
- 105 Cross Creek · City Of LakewaySep 30, 2024Lakeway activity center playground — renovation/alteration — reconstruct playground area into new ada accessible playground · 580 m away