408 Palos Verdes Dr
Lakeway, TX 78734
Electrical service upgrade at 408 Palos Verdes Dr
A permit filed September 21, 2026, indicates an upgrade to the existing 200-amp underground electrical service at 408 Palos Verdes Dr. The work calls for a new panel and meter on a like-for-like basis.
Summarized from City of Austin records · updated Sep 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 21, 2026
- since Sep 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency upgrade of existing 200amp underground service with new panel and meter like for like
- AppliedSep 17, 2026
- IssuedSep 21, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 25, 2026
Passed final inspection Sep 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency upgrade of existing 200amp underground service with new panel and meter like for like
Emergency upgrade of existing 200amp underground service with new panel and meter like for like
City of Austin permitElectrical PermitFinal- Record
- 2026-122293 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 408 Palos Verdes Dr
What work is planned at 408 Palos Verdes Dr?
A City of Austin electrical permit indicates an upgrade to the existing 200-amp underground service, with a new panel and meter.
Is a new home being built at 408 Palos Verdes Dr?
The permit record describes an upgrade to an existing electrical service, not construction of a new home.
When was the electrical permit filed for 408 Palos Verdes Dr?
The permit was filed on September 21, 2026.
What is the permit number for 408 Palos Verdes Dr?
The City of Austin permit number is 2026-122293 EP.
Has the electrical permit for 408 Palos Verdes Dr been finalized?
The permit record lists its status as Final.
Also being built nearby
All of 78734- 108 Kerry CtNov 10, 2026Spot closed 12/3/25 - temporary power pole for use during construction of new home. 11/10/26 cm re-activating permit due to feeders being inverted in meter can ( line side installed on bottom lugs) · 29 m away
- 307 Palos Verdes DrOct 24, 2024Etj new service for sfr · 191 m away
- 213 Palos Verdes DrOct 30, 2026Base: installing a backup battery system and additional meter socket · 358 m away
- 101 Tamarac CtFeb 5, 2026Install new 18.705kw rooftop solar system for existing residential only · 408 m away
- 209 Palos Verdes DrOct 23, 2026Etj - install/replace 200 amp main breaker panel and meter can (underground) · 411 m away
- 904 Palos Verdes DrAug 4, 2026Temp power pole · 453 m away
- 405 Duck Lake DrOct 1, 2026Etj. new service for sfr · 520 m away
- 121 Clubhouse DrApr 6, 2026Permanent electrical service for new sfr in etj · 561 m away
- 103 Palos Verdes DrNov 18, 2026Base: installing a backup battery system and additional meter socket · 583 m away