19 Green Terrace Cv
Lakeway, TX 78734
Rooftop solar and battery equipment permitted at Lakeway home
Permits indicate a 13.8 kW DC rooftop solar system and battery backup equipment are being installed at an existing residence at 19 Green Terrace Cv. The battery equipment permit was filed October 7, 2024, and the solar permit was filed February 17, 2025; both are marked final.
Summarized from City of Austin records · updated Feb 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Feb 17, 2025
- since Oct 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 13.8 kw dc rooftop solar system to existing residential
- AppliedFeb 13, 2025
- IssuedFeb 17, 2025
- WorkFeb '25 – Nov '25
- Final inspectionOct 22, 2025
Passed final inspection Oct 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 13.8 kw dc rooftop solar system to existing residential
Install new 13.8 kw dc rooftop solar system to existing residential
City of Austin permitElectrical PermitFinal- Record
- 2025-018177 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We are installing (1) tesla powerwall 3/1707000-xx-y and (1) tesla backup gateway 2
We are installing (1) tesla powerwall 3/1707000-xx-y and (1) tesla backup gateway 2
City of Austin permitElectrical PermitFinal- Record
- 2024-113858 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 19 Green Terrace Cv
What is being installed at 19 Green Terrace Cv?
City of Austin permits indicate rooftop solar and battery backup equipment for an existing residence. The solar system is listed as 13.8 kW DC.
When was the solar permit filed at 19 Green Terrace Cv?
Permit 2025-018177 EP was filed February 17, 2025, for a new 13.8 kW DC rooftop solar system. Its status is Final.
What battery equipment is planned at 19 Green Terrace Cv?
Permit 2024-113858 EP, filed October 7, 2024, describes one Tesla Powerwall 3 and one Tesla Backup Gateway 2. The permit is marked Final.
Is a new home being built at 19 Green Terrace Cv?
The records describe solar and battery work at an existing residence, not construction of a new home.
What's being installed near Lakeway Commons 900?
At 19 Green Terrace Cv, about 577 meters from Lakeway Commons 900, permits indicate rooftop solar and battery backup equipment for an existing residence.
Also being built nearby
All of 78734- 15229 Dave DrApr 15, 2024Temporary power · 125 m away
- 35 Green Terrace CvSep 10, 2025Install new 6.375 kw rooftop solar system for existing residential only · 134 m away
- 34 Green Terrace CvFeb 20, 2025Install new 10.12 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential · 140 m away
- 15228 Dave DrMar 25, 2025Etj-rack service with 5 meters for units a b c d and hp · 163 m away
- 15099 Joseph DrMay 24, 2024Replacement of an existing water heater · 232 m away
- 90 White Magnolia CirOct 28, 2026Shoemaker - 40-26286 - install new 3.8 kw rooftop solar system to existing residential only using backfed breaker only · 258 m away
- 88 White Magnolia CirOct 7, 2024Ev install · 262 m away
- 905 Chickadee LnMay 6, 2026Replacement of an existing water heater 50 gallon propane water heater change out 905 chickadee lane austin tx 78734 · 287 m away
- 15401 Barrie DrAug 22, 2024Move meter back several feet for exterior stairwell due to fire · 329 m away
- 15092 Joseph DrSep 26, 2025Disconnect/reconnect to upgrade main distribution panel · 345 m away
- 15093 Barrie DrApr 14, 2025Electrical service meter installation for new construction of sfr in the etj. 3323 sq ft · 379 m away
- 15501 Barrie DrNov 19, 2026Base: installing a backup battery system and additional meter socket · 409 m away
More solar installs in 78734.