35 Green Terrace Cv

Lakeway, TX 78734

Rooftop solar and electrical panel upgrade at 35 Green Terrace Cv

A 6.375-kW rooftop solar system and an upgraded main distribution panel were permitted for an existing residence at 35 Green Terrace Cv. City of Austin permits for both projects were filed on September 10, 2025, and are listed as final.

Summarized from City of Austin records · updated Sep 10, 2025

Projects
2
2 filings
Latest filing
Sep 10, 2025
since Sep 10, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 6.375 kw rooftop solar system for existing residential only

  1. AppliedSep 9, 2025
  2. IssuedSep 10, 2025
  3. WorkSep '25 – Mar '26
  4. Final inspectionNov 10, 2025

Passed final inspection Nov 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 6.375 kw rooftop solar system for existing residential only

    Install new 6.375 kw rooftop solar system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 35 Green Terrace Cv

What is being built at 35 Green Terrace Cv?

A 6.375-kW rooftop solar system is being installed at the existing residence, along with an upgrade to the main distribution panel. The City of Austin permits were filed September 10, 2025.

When was the rooftop solar system permitted at 35 Green Terrace Cv?

The permit was filed September 10, 2025. City of Austin permit 2025-114520 EP is listed as final.

Is a new home being built at 35 Green Terrace Cv?

The permits describe work at an existing residence: a rooftop solar installation and a main distribution panel upgrade.

What electrical work is permitted at 35 Green Terrace Cv?

Two electrical permits were filed September 10, 2025. Permit 2025-114520 EP covers the rooftop solar system, and permit 2025-114532 EP covers disconnecting and reconnecting the service to upgrade the main distribution panel.

How large is the solar system at 35 Green Terrace Cv?

The City of Austin permit describes a new 6.375-kW rooftop solar system for the existing residence.

Are the permits for 35 Green Terrace Cv final?

Yes. Both City of Austin electrical permits, 2025-114520 EP and 2025-114532 EP, are listed as final.