106 Lodestone Cv
Lakeway, TX 78738
18 kW rooftop solar system permitted at Lakeway home
A City of Austin permit filed August 13, 2025, covers installation of a new 18 kW rooftop solar system at an existing residence at 106 Lodestone Cv in Lakeway. The permit record, 2025-100640 EP, is marked Final.
Summarized from City of Austin records · updated Aug 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2025
- since Aug 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall a new 18 kw rooftop solar system to existing residential only
- AppliedAug 8, 2025
- IssuedAug 13, 2025
- WorkAug '25 – Feb '26
- Final inspectionOct 1, 2025
Passed final inspection Oct 1, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall a new 18 kw rooftop solar system to existing residential only
Install a new 18 kw rooftop solar system to existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-100640 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 106 Lodestone Cv
What is being installed at 106 Lodestone Cv in Lakeway?
A permit covers a new 18 kW rooftop solar system at the existing residence. The City of Austin permit is 2025-100640 EP, filed August 13, 2025.
When was the solar permit filed for 106 Lodestone Cv?
The permit was filed August 13, 2025. Its record status is Final.
What is the permit number for the solar installation at 106 Lodestone Cv?
The permit number is 2025-100640 EP. It covers a new 18 kW rooftop solar system at an existing residence.
Is the solar project at 106 Lodestone Cv for a home?
Yes. The permit description specifies an installation at an existing residence.
How large is the rooftop solar system planned for 106 Lodestone Cv?
The permit describes a new 18 kW rooftop solar system.
Also being built nearby
All of 78738- 312 Lodestone LnOct 19, 2026Base: installing a backup battery system and additional meter socket · 373 m away
- 3904 Pawnee PassDec 11, 2023Generator install with automatic transfer switch · 408 m away
- 3910 Pawnee PassJun 14, 2024Installing standby generator 26kw & ats. needing a temp disconnect/reconnect · 423 m away
- 309 Golden Bear DrNov 29, 2023New construction sfr in etj · 473 m away
- 4405 Hennig DrMay 22, 2024**request to disconnect** install 2 automatic transfer switches and run wire from 320 amp meter can. underground service. run conduit and wire from automatic transfer switch to generator · 522 m away
- 301 Golden Bear DrOct 28, 2024Install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only · 575 m away
More solar installs in 78738.