301 Golden Bear Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 301 Golden Bear Dr, Lakeway, TX 78738 since October 25, 2024. The most recent, filed October 28, 2024, covers: “Install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only”.
Compiled from City of Austin records · updated Oct 28, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 28, 2024
- since Oct 25, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only
- AppliedOct 18, 2024
- IssuedOct 28, 2024
- WorkOct '24 – Mar '25
- Final inspectionMar 7, 2025
Passed final inspection Mar 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only
Install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only
City of Austin permitElectrical PermitFinal- Record
- 2024-140902 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size
Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size
City of Austin permitElectrical PermitFinal- Record
- 2024-140908 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 301 Golden Bear Dr
What is being built at 301 Golden Bear Dr?
The latest filing (City of Austin permit 2024-140902 EP, October 28, 2024) covers install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only.
How many permits and filings does 301 Golden Bear Dr have?
2 filings across 2 projects, from October 25, 2024 to October 28, 2024.
Is there other construction near 301 Golden Bear Dr?
Yes. Nearby filings include 309 Golden Bear Dr (new construction sfr in etj, Nov 29, 2023); 229 Golden Bear Dr (etj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards, Jul 22, 2025); 106 Golden Bear Dr (base: installing a backup battery system and additional meter socket, Nov 5, 2026).
How do I get alerts for new permits at 301 Golden Bear Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78738- 309 Golden Bear DrNov 29, 2023New construction sfr in etj · 106 m away
- 229 Golden Bear DrJul 22, 2025Etj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards · 171 m away
- 106 Golden Bear DrNov 5, 2026Base: installing a backup battery system and additional meter socket · 556 m away
- 104 Golden Bear DrNov 29, 2023Replacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same · 565 m away
- 106 Lodestone CvAug 13, 2025Install a new 18 kw rooftop solar system to existing residential only · 575 m away