104 Golden Bear Dr
Lakeway, TX 78738
104 Golden Bear Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 104 Golden Bear Dr, Lakeway, TX 78738. The most recent, filed November 29, 2023, covers: “Replacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same”.
Compiled from City of Austin records · updated Nov 29, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 29, 2023
- since Nov 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit pendingReplacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same
- AppliedNov 29, 2023
- IssuedNov 29, 2023
- WorkNov 29, 2023
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same
Replacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same
City of Austin permitElectrical PermitPending- Record
- 2023-153127 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 104 Golden Bear Dr
What is being built at 104 Golden Bear Dr?
The latest filing (City of Austin permit 2023-153127 EP, November 29, 2023) covers replacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same.
How many permits and filings does 104 Golden Bear Dr have?
1 filing across 1 project, from November 29, 2023 to November 29, 2023.
Is there other construction near 104 Golden Bear Dr?
Yes. Nearby filings include 106 Golden Bear Dr (base: installing a backup battery system and additional meter socket, Nov 5, 2026); 101 The Hills Dr (install 26 kw generator and 2 transfer switches, Dec 21, 2023); 414 Belforte Ave (base: installing a backup battery system and additional meter socket, Sep 7, 2026).
How do I get alerts for new permits at 104 Golden Bear Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78738- 106 Golden Bear DrNov 5, 2026Base: installing a backup battery system and additional meter socket · 33 m away
- 101 The Hills DrDec 21, 2023Install 26 kw generator and 2 transfer switches · 352 m away
- 414 Belforte AveSep 7, 2026Base: installing a backup battery system and additional meter socket · 421 m away
- 229 Golden Bear DrJul 22, 2025Etj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards · 466 m away
- 6 Tiburon DrNov 6, 2024We will be rerouting a main feeder line/underground conduit for 6 tiburon drive to make way for an in ground pool. currently is running through projected area and will need to move to achieve the 5 from waters edge. it will remain a 200a service but will be upgrading the meter can to bypass can and replacing the main house panel · 475 m away
- 224 Versilia CirNov 6, 2026Base: installing a backup battery system and additional meter socket · 520 m away
- 8 Torrington CtFeb 19, 2024Rerouting service feed for new pool. no meter work required disconnect / reconnect · 524 m away
- 301 Golden Bear DrOct 28, 2024Install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only · 565 m away
- 213 Rivulet LnApr 2, 2026New sq ft residence with attached porch and garage only eud · 584 m away