229 Golden Bear Dr
Lakeway, TX 78738
229 Golden Bear Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 229 Golden Bear Dr, Lakeway, TX 78738 since January 15, 2024. The most recent, filed July 22, 2025, covers: “Etj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards”.
Compiled from City of Austin records · updated Jul 22, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 22, 2025
- since Jan 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEtj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards
- AppliedJul 18, 2025
- IssuedJul 22, 2025
- WorkJul '25 – Sep '25
- Final inspectionSep 3, 2025
Passed final inspection Sep 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsEtj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards
Etj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards
City of Austin permitElectrical PermitFinal- Record
- 2025-089752 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Service only upgrade from 200amp underground to 225amp
Service only upgrade from 200amp underground to 225amp
City of Austin permitElectrical PermitFinal- Record
- 2024-001755 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 229 Golden Bear Dr
What is being built at 229 Golden Bear Dr?
The latest filing (City of Austin permit 2025-089752 EP, July 22, 2025) covers etj disconnect/reconnect services to install ats for generator. this project involves coordinating with austin energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a kohler 26kw standby generators automatic transfer switch (ats) to the residential electrical service. no new meter is being installed and the generator installation itself has been separately permitted and inspected through the city of lakeway. this permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ats. the scope of work includes coordinating with austin energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ats and reinstalling the existing meter upon completion. no service upgrade meter base replacement or structural modifications are included. all work will be performed in compliance with applicable codes and safety standards.
How many permits and filings does 229 Golden Bear Dr have?
2 filings across 2 projects, from January 15, 2024 to July 22, 2025.
Is there other construction near 229 Golden Bear Dr?
Yes. Nearby filings include 301 Golden Bear Dr (install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only, Oct 28, 2024); 309 Golden Bear Dr (new construction sfr in etj, Nov 29, 2023); 106 Golden Bear Dr (base: installing a backup battery system and additional meter socket, Nov 5, 2026).
How do I get alerts for new permits at 229 Golden Bear Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78738- 301 Golden Bear DrOct 28, 2024Install new 10.12kw rooftop solar system and 13.5kw battery storage system for residential only · 171 m away
- 309 Golden Bear DrNov 29, 2023New construction sfr in etj · 277 m away
- 106 Golden Bear DrNov 5, 2026Base: installing a backup battery system and additional meter socket · 449 m away
- 104 Golden Bear DrNov 29, 2023Replacing main breaker with automatic transfer switch. no meter work required. existing service to stay the same · 466 m away
- 3708 S Pawnee PassMay 24, 2024Demolition existing 200 amp meter. upgrade to new 320 meter adding new 150 amp panel for future expansion · 544 m away