108 Hensley Cir
Lakeway, TX 78738
108 Hensley Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 108 Hensley Cir, Lakeway, TX 78738. The most recent, filed December 27, 2023, covers: “Replace 200a main breaker panel disconnect / reconnect”.
Compiled from City of Austin records · updated Dec 27, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 27, 2023
- since Dec 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace 200a main breaker panel disconnect / reconnect
- AppliedDec 21, 2023
- IssuedDec 27, 2023
- WorkDec '23 – Jun '24
- Final inspectionJun 28, 2024
Passed final inspection Jun 28, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace 200a main breaker panel disconnect / reconnect
Replace 200a main breaker panel disconnect / reconnect
City of Austin permitElectrical PermitFinal- Record
- 2023-162435 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 108 Hensley Cir
What is being built at 108 Hensley Cir?
The latest filing (City of Austin permit 2023-162435 EP, December 27, 2023) covers replace 200a main breaker panel disconnect / reconnect.
How many permits and filings does 108 Hensley Cir have?
1 filing across 1 project, from December 27, 2023 to December 27, 2023.
Is there other construction near 108 Hensley Cir?
Yes. Nearby filings include 214 Vailco Ln (13.53 kw dc roof mount solar system, Sep 5, 2024); 114 Sebastians Run (etj - base: installing a backup battery system and additional meter socket, Oct 28, 2026); 204 Vailco Ln (request to disconnect connecting ess gateway. underground service. austin energy. meter can does not require replacement - no espa attached, Mar 19, 2024).
How do I get alerts for new permits at 108 Hensley Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78738- 214 Vailco LnSep 5, 202413.53 kw dc roof mount solar system · 172 m away
- 114 Sebastians RunOct 28, 2026Etj - base: installing a backup battery system and additional meter socket · 187 m away
- 204 Vailco LnMar 19, 2024Request to disconnect connecting ess gateway. underground service. austin energy. meter can does not require replacement - no espa attached · 187 m away
- 121 Lakota PassOct 3, 2024Install 15.96 kw dc solar with 15.0 kwh ess · 261 m away
- 128 Sebastians RunMay 20, 2026Install new 3.924 kw rooftop solar system for existing residential only · 287 m away
- 211 Varco DrApr 17, 2025Installing 20.5kw solar system with 22.8kw ac fox-ess hybrid inverter with 39.7kwh of battery storage · 290 m away
- 150 Lakota PassMar 21, 2025Request to disconnect leave existing 200 and meter replace main panel with new 200 amp · 448 m away