groundranger
Historic · latest filing Oct 2024Residential

121 Lakota Pass

Lakeway, TX 78738

121 Lakota Pass: 2 projects on record

City of Austin lists 2 filings across 2 projects at 121 Lakota Pass, Lakeway, TX 78738 since September 12, 2024. The most recent, filed October 3, 2024, covers: “Install 15.96 kw dc solar with 15.0 kwh ess”.

Compiled from City of Austin records · updated Oct 3, 2024

Projects
2
2 filings
Latest filing
Oct 3, 2024
since Sep 12, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install 15.96 kw dc solar with 15.0 kwh ess

  1. AppliedSep 9, 2024
  2. IssuedOct 3, 2024
  3. WorkOct '24 – Nov '24
  4. Final inspectionNov 15, 2024

Passed final inspection Nov 15, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install 15.96 kw dc solar with 15.0 kwh ess

    Install 15.96 kw dc solar with 15.0 kwh ess

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect install transfer switch - load size of the transfer switch is 200 amp

    Request to disconnect install transfer switch - load size of the transfer switch is 200 amp

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 121 Lakota Pass

What is being built at 121 Lakota Pass?

The latest filing (City of Austin permit 2024-121967 EP, October 3, 2024) covers install 15.96 kw dc solar with 15.0 kwh ess.

How many permits and filings does 121 Lakota Pass have?

2 filings across 2 projects, from September 12, 2024 to October 3, 2024.

Is there other construction near 121 Lakota Pass?

Yes. Nearby filings include 211 Varco Dr (installing 20.5kw solar system with 22.8kw ac fox-ess hybrid inverter with 39.7kwh of battery storage, Apr 17, 2025); 150 Lakota Pass (request to disconnect leave existing 200 and meter replace main panel with new 200 amp, Mar 21, 2025); 108 Hensley Cir (replace 200a main breaker panel disconnect / reconnect, Dec 27, 2023).

How do I get alerts for new permits at 121 Lakota Pass?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78738

More solar installs in 78738.

Email me when a new permit is filed