1860 College Pkwy
Lewisville, TX 75077 · Lewisville ISD - Tania Caudill
Degan Elementary plans a 20-year refresh and full reroof
A 20-year finish refresh to part of Degan Elementary and a reroof of the entire school are planned at 1860 College Pkwy. The Texas Department of Licensing and Regulation registered the 24,400-square-foot renovation on September 6, 2024; the registration says no major architectural work is planned. The applicant's estimated project cost is $6.1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 6, 2024
- since Sep 6, 2024
- Largest scope
- 24,400 sf
- Estimated cost
- $6.1M
- state registration
Where this project stands
In state plan reviewDegan Elementary – 20-yr refresh ph 2
24,400 sq ft · $6.1M est.
- RegisteredSep 6, 2024
- Plan reviewnow
- ConstructionApr '25 – Aug '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 project20 year finish refresh of a portion of the school. no major architectural work. reroofing entire school. — degan elementary school
TDLR project registrationRenovation/AlterationProject Registered24,400 sq ft$6.1M est.- Project #
- TABS2025000419
- Tenant / owner
- Degan Elementary – 20-Yr Refresh Ph 2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1860 College Pkwy
What is being built at 1860 College Pkwy in Lewisville?
A renovation at Degan Elementary includes a 20-year finish refresh to part of the school and reroofing the entire school. The TDLR registration says no major architectural work is planned.
When was the Degan Elementary refresh permitted?
The project was registered with the Texas Department of Licensing and Regulation on September 6, 2024. The registration number is TABS2025000419.
How much will the Degan Elementary renovation cost?
The applicant's estimated cost for the project is $6.1 million, according to the TDLR registration. This is an estimate, not a reported final cost.
How much of Degan Elementary is being renovated?
The registration lists the project at 24,400 square feet. It describes a finish refresh of a portion of the school and a reroof of the entire building.
What's being renovated near Kingdom Hall on Kirkpatrick Lane?
Degan Elementary, at 1860 College Pkwy, is about 261 meters from Kingdom Hall at 4611 Kirkpatrick Ln. Its registered renovation includes a partial finish refresh and a full-school reroof.
What's being renovated near Colony Park in Lewisville?
Degan Elementary's 20-year refresh and reroof project is about 483 meters from Colony Park at 1015 Colony St. The TDLR registration was filed on September 6, 2024.
Also being built nearby
All of 75077- 4611 Kirkpatrick Ln · Kingdom HallMay 7, 2026Flower mound church building — renovation/alteration — replace exterior veneer, hvac units, low voltage, flooring, doors, drop ceiling. update cabinets with paint and wall paint · 261 m away
- 1015 Colony St · Colony ParkMay 14, 2026Colony park improvements — renovation/alteration — replacing 2,748 linear feet of 6-foot sidewalk with 6-foot sidewalk · 483 m away