701 W. El Dorado Pkwy
Little Elm, TX 75068 · Town Of Little Elm
Little Elm registers camping and amphitheater upgrades
The Town of Little Elm registered a project for upgrades to the primitive camping area and amphitheater at 701 W. El Dorado Pkwy. The Sept. 4, 2025, registration describes camp pads, prefabricated restroom buildings, a pavilion, a fire ring, picnic areas and amphitheater seating; the applicant’s estimated project cost is $3.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- 181,508 sf
- Estimated cost
- $3.8M
- state registration
Where this project stands
Inspected · closing outThe Town of Little Elm-Primitive Camping and Amphitheater
181,508 sq ft · $3.8M est.
- RegisteredSep 4, 2025
- Plan review
- ConstructionOct '25 – Mar '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project includes upgrades to the primitive camping are. project to incorporate camp pads, prefabricated restroom buildings and pavilion, camp fire ring, picnic zones, and amphitheater upgrades with seating — town of little elm
TDLR project registrationNew ConstructionInspection Complete181,508 sq ft$3.8M est.- Project #
- TABS2026000327
- Tenant / owner
- The Town Of Little Elm-Primitive Camping And Amphitheater
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 701 W. El Dorado Pkwy
What is being built at 701 W. El Dorado Pkwy in Little Elm?
A Town of Little Elm project will upgrade the primitive camping area and amphitheater. The registration lists camp pads, prefabricated restroom buildings, a pavilion, a fire ring, picnic areas and amphitheater seating.
When was the Little Elm camping and amphitheater project registered?
The Texas Department of Licensing and Regulation registration is dated Sept. 4, 2025. Its project number is TABS2026000327.
How much will the Little Elm camping project cost?
The applicant’s estimated cost for the project is $3.8 million, according to the TDLR registration. This is an estimate, not a confirmed final cost.
Will the primitive camping area get new facilities?
The project description lists camp pads, prefabricated restroom buildings, a pavilion, a fire ring and picnic areas as part of the upgrades.
Is the amphitheater at 701 W. El Dorado Pkwy being upgraded?
Yes. The project description includes amphitheater upgrades with seating. The TDLR record lists the project status as inspection complete.