110 E. Cotton Street
Longview, TX 75601 · Special Health Resources
Interior and parking lot renovation at 110 E. Cotton Street
A two-phase renovation is registered for 110 E. Cotton Street, including work on the building’s interior and the parking lot on its south side. The Texas Department of Licensing and Regulation registration was filed on August 1, 2024, and describes a 3,500-square-foot interior remodel. The applicant’s estimated project cost is $1.1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 1, 2024
- since Aug 1, 2024
- Largest scope
- 3,500 sf
- Estimated cost
- $1.1M
- state registration
Where this project stands
CompletedRemodel of 110 E. Cotton Street
3,500 sq ft · $1.1M est.
- RegisteredAug 1, 2024
- Plan review
- ConstructionSep '24 – May '25
- Inspected
- Closed
Ran as a 9-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectParking lot renovation on south side of building, entire interior remodel with new walls, cabinets, finishes, plumbing, electrical, and mechanical. 2 phases. — special health resources
TDLR project registrationRenovation/AlterationProject Closed3,500 sq ft$1.1M est.- Project #
- TABS2024024502
- Tenant / owner
- Remodel Of 110 E. Cotton Street
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 110 E. Cotton Street
What is being built at 110 E. Cotton Street?
A two-phase renovation is registered for the building, including a parking lot renovation on its south side and a full interior remodel. The TDLR project registration is TABS2024024502.
When was the 110 E. Cotton Street renovation permitted?
The project was registered with the Texas Department of Licensing and Regulation on August 1, 2024. The record lists it as a renovation and alteration.
What work is planned inside 110 E. Cotton Street?
The registration describes new walls, cabinets and finishes, along with plumbing, electrical and mechanical work. It lists the interior remodel as 3,500 square feet.
How much is the 110 E. Cotton Street renovation estimated to cost?
The applicant’s estimated cost for the project is $1.1 million. This is an estimate, not a confirmed final cost.
Is 110 E. Cotton Street being renovated near the Longview Wow Children's Museum?
Yes. The renovation site is about 141 meters from the Longview Wow Children's Museum at 112 E. Tyler St.
Is the project at 110 E. Cotton Street for Special Health Resources?
The project description identifies Special Health Resources in connection with the renovation. The registration describes work to the building interior and south-side parking lot.
Also being built nearby
All of 75601- 112 E Tyler St · Longview Wow Children's MuseumAug 18, 2025Longview wow upstairs renovation — renovation/alteration — renovate second floor to create new office spaces, conference room, break room, and restroom · 141 m away
- 140 E. Tyler Street · Glover Crim, Ltd.Apr 21, 2026Mitigation resources - 3rd floor — renovation/alteration — construct 10 offices and breakroom in existing office · 146 m away
- 217 N Center St · The 217 CenterJun 21, 2025Lgbs office remodel — renovation/alteration — 3997 sq ft remove all suspended ceilings, doors, floor coverings, lighting, communications wiring. reconfigure floor plan. replace wiring, air ducts, drywall, doors, woodwork, suspended ceilings, plumbing fixtures, lighting, paint, flooring · 232 m away
- 213 N Fredonia Street · Longview Museum Of Fine ArtsOct 1, 2025Longview museum of fine arts — renovation/alteration — renovation of historic bank building for an art museum. total building area 55,550 sq ft project may be phased due to available funds · 258 m away
- 222 N Fredonia St · 222 N Fredonia LLCJul 6, 2026Foundation repair & finish replacement — renovation/alteration — foundation repair and finish repair/replacement · 268 m away
- 100 E. Methvin Street · Gregg CountyMar 16, 2026Gregg county da office remodel — renovation/alteration — office renovation to add additional offices to existing space and update finishes · 274 m away
- 300 W. Cotton St · City Of LongviewJun 17, 2026Finance & info services interior renovation — renovation/alteration — renovation / reconfiguration of interior spaces in the southeast and southwest wings of the existing city hall building · 322 m away
- 400 N. Fredonia Street · First United Methodist ChurchFeb 21, 2024Green street improvements — new construction — exterior improvements to the east side of the facility including new concrete parking lot, drive-through porte cochere, covered basketball pavilion and associated sports equipment storage building · 439 m away
- 410 S High Street · City Of LongviewNov 2, 2026Development services remodel — renovation/alteration — addition of ten (10) new exterior windows, interior painting, and flooring replacement throughout the building with the exception of the existing restrooms and janitorial closet. (14,393 sq ft) · 592 m away