groundranger
Recent · latest filing Jun 2025Commercial

217 N Center St

Longview, TX 75601 · The 217 Center

3,997-square-foot office remodel at The 217 Center

A 3,997-square-foot office remodel is planned at 217 N Center St in Longview. The Texas Department of Licensing and Regulation registered the renovation on June 21, 2025, under project number TABS2025021779. The project description calls for reconfiguring the floor plan and replacing wiring, air ducts, ceilings, lighting, plumbing fixtures, and other finishes.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 21, 2025

Projects
1
1 filings
Latest filing
Jun 21, 2025
since Jun 21, 2025
Largest scope
3,997 sf
Estimated cost
$389K
state registration

Where this project stands

Finishing up · inspection next

LGBS Office Remodel

3,997 sq ft · $389K est.

  1. RegisteredJun 21, 2025
  2. Plan review
  3. ConstructionJun '20 – Dec '25
  4. Inspectednow
  5. Closed

Scheduled to finish Dec 31, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. LGBS Office Remodel

    3997 sq ft remove all suspended ceilings, doors, floor coverings, lighting, communications wiring. reconfigure floor plan. replace wiring, air ducts, drywall, doors, woodwork, suspended ceilings, plumbing fixtures, lighting, paint, flooring — the 217 center

    TDLR project registrationRenovation/AlterationReview Complete3,997 sq ft$389K est.
    Tenant / owner
    Lgbs Office Remodel
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 217 N Center St

What is being built at 217 N Center St in Longview?

A 3,997-square-foot office space at The 217 Center is being remodeled, according to TDLR project registration TABS2025021779, dated June 21, 2025. The plans include reconfiguring the floor plan and replacing building systems and finishes.

When was the office remodel at 217 N Center St registered?

The TDLR registration was filed on June 21, 2025. The project status is listed as Review Complete.

What work is planned for The 217 Center office remodel?

The project description says the existing ceilings, doors, floor coverings, lighting, and communications wiring will be removed. It also lists replacement wiring, air ducts, drywall, doors, woodwork, ceilings, plumbing fixtures, lighting, paint, and flooring.

How much will the 217 N Center St remodel cost?

The applicant's TDLR estimate for the project is $389,340. This is an estimate, not a confirmed final cost.

What's being remodeled near Gregg County in Longview?

The 217 Center at 217 N Center St is registered for a 3,997-square-foot office renovation. Gregg County, at 100 E. Methvin Street, is listed about 45 meters away.

Is there an office remodel near the Longview Wow Children's Museum?

Yes. TDLR records list an office remodel at 217 N Center St, about 94 meters from the Longview Wow Children's Museum. The registration was filed June 21, 2025, as TABS2025021779.

Also being built nearby

All of 75601

More offices in 75601.

Email me when it passes inspection