402 E Louisiana St
McKinney, TX 75069 · Mckinney Community Development Corporation
Lelo’s Coffee remodel and silo finish-out in McKinney
A remodel at 402 E Louisiana St is registered for a coffee shop in an existing wood-frame building and a coffee roaster with a sales window in an existing metal silo. The Texas Department of Licensing and Regulation registration was filed April 4, 2024, and the project is marked inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 4, 2024
- since Apr 4, 2024
- Largest scope
- 1,029 sf
- Estimated cost
- $100K
- state registration
Where this project stands
Inspected · closing outLelo's Coffee
1,029 sq ft · $100K est.
- RegisteredApr 4, 2024
- Plan review
- ConstructionApr '24 – Aug '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectRemodel of an existing 774 s.f. wood frame building and a finish-out of an existing 255 s.f. metal silo. the two are being finished out to house a coffee shop in the frame building and coffee roaster with a sales window in the silo. — tupps brewery
TDLR project registrationRenovation/AlterationInspection Complete1,029 sq ft$100K est.- Project #
- TABS2024015452
- Tenant / owner
- Lelo's Coffee
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 402 E Louisiana St
What is being built at 402 E Louisiana St in McKinney?
The project is a remodel of an existing 774-square-foot wood-frame building and a finish-out of an existing 255-square-foot metal silo. The registration describes a coffee shop in the building and a coffee roaster with a sales window in the silo.
Is Lelo’s Coffee opening at 402 E Louisiana St?
The TDLR project registration names Lelo’s Coffee and describes space being finished out for a coffee shop and coffee roaster. It was filed April 4, 2024, and is marked inspection complete.
When was the 402 E Louisiana St project registered?
The TDLR registration, project number TABS2024015452, was filed April 4, 2024.
How large is the Lelo’s Coffee project in McKinney?
The registered work covers 1,029 square feet: 774 square feet in the wood-frame building and 255 square feet in the metal silo.
What’s being remodeled near East End Lumberyard in McKinney?
At 402 E Louisiana St, the registration describes a coffee shop remodel and silo finish-out for a coffee roaster with a sales window. East End Lumberyard is listed about 113 meters away.
What’s going in near Bresnan Bread and Pastry on East Louisiana Street?
The TDLR registration for 402 E Louisiana St describes a coffee shop and a coffee roaster with a sales window. Bresnan Bread and Pastry is listed about 253 meters away.
Also being built nearby
All of 75069- 402 E. Louisiana Street · Mckinney Community Development CorporationJul 6, 2026Tupps soccer field — new construction — 6,000 square feet
- 704 Greenville Road · Mckinney Community Development CorporationOct 4, 2024East mckinney learning garden — new construction — new landscape, decomposed granite paving, utilities · 42 m away
- 401 E Virginia St · City Of MckinneyJan 13, 2026Mckinney municipal addition — renovation/alteration — updating closet to single user restroom and changing toilets to urinals in multi-user restroom · 92 m away
- 600 East Louisiana Street · East End LumberyardJun 1, 2026East end lumberyard restoration — new construction — construction of 3,200 sq ft warehouse and renovation of 500 sq ft detached office building with related site improvements · 113 m away
- 101 S Chestnut St · Ben Kuehne Holdings 2 LLC & Alycia Kuehne Holdings 2 LLCDec 26, 2025The cipher lounge — renovation/alteration — interior remodel · 252 m away
- 103 South Chestnut Street · Ben Kuehne Holdings 2 LLC & Alycia Kuehne Holdings 2 LLCSep 12, 2025Kbi, llc - elevator addition — renovation/alteration — add new elevator, lobby, and exterior door for second floor. separate from balance of first floor with 1-hr tenant separation to bottom of second composite floor deck · 252 m away
- 103 S Chestnut St · Ben Kuehne Holdings 2 LLCOct 20, 2025The chestnut hall — renovation/alteration — build out · 252 m away
- 301-B E Louisiana St · Bresnan Bread And PasteryApr 28, 2025Bresnan bread and pastry — renovation/alteration — finish out · 253 m away
- 801 Green Street 801 Green Street · Hugs CafeDec 20, 2024Hugs training facility — new construction — office space, training and dining cafe · 256 m away
- 300 N Mcdonald St · Heritage Mckinney SquareAug 31, 2026Image studios mckinney – tenant finish-out — renovation/alteration — interior finish-out of 4,233 sq ft ground-floor retail shell into an image studios salon-suite facility: 22 salon suites, reception/retail, accessible restrooms, laundry/back-of-house, and break area; interior partitions, mep, plumbing to suites, finish · 262 m away
- 131 S. Chestnut Street · City Of MckinneyDec 15, 2025Mckinney water meter building — renovation/alteration — add a small 625 sq ft room for testing water meters · 264 m away
- 224 E Virginia Street · Sp1 220 E Virginia LLCJul 10, 2026Lusso pasta market — renovation/alteration — 2,112 sq ft interior finish out of one story existing building in historic downtown mckinney. minimal work (primarily finishes) in existing cafe · 329 m away