New schools & daycares in Missouri City 77459
2 addresses in 77459 have permits or project filings for schools & daycares in the last two years. The most recent was filed at 3019 FM 1092 Rd.
Latest filings
- 3019 FM 1092 Rd · Ft Bend ISDJul 16, 2026Fbisd bp036 sitework — renovation/alteration — scope of work: 1. install additional underground storm in parking lots to help drainage and flooding. district states that current drainage is inadequate. circular driveway floods easily; southwest corner of building floods; neighborhood behind the s
- 7707 Highway 6 · Fort Bend Care CenterMay 21, 2026Fort bend care center — new construction — a single story 14438 gsf community center with 4 daycare classrooms (age 3+), 7 educational classrooms, multipurpose room, lobby & support spaces. the building is located on the fort bend community church campus
- 5304 Sienna Pkwy · Arvo Sienna Town Center LLCMar 13, 2026Healthsource chiropractic — renovation/alteration — buildout for chiropractic office
- 7007 Knights Ct · Fbisd Design And Construction DepartmentFeb 9, 2026Fbisd bp036 sitework package 1 — renovation/alteration — scope of work: 1. replace existing covered walkway and courtyard canopy covering to properly drain and jet clean existing storm line. (sid36005) 2. replace existing skylight system. (sid36011) 3. remove, regrade, and replace concrete pavement that ha
- 1510 Columbia Blue Drive · Fbisd Design And Construction DepartmentFeb 9, 2026Fbisd bp036 sitework package 1 — renovation/alteration — scope of work: 1. remove, regrade, and replace parking lot at front of school and drive as well. (sid36007) 2. remove, regrade, and replace staff parking lot behind school near daycare. (sid36008) 3. remove, regrade, and replace numerous places in st
- 3100 Lake Olympia Parkway · Fbisd Design And Construction DepartmentFeb 9, 2026Fbisd bp036 sitework package 1 — renovation/alteration — repair of parking and walkways
- 4208 Crow Valley Dr · Fort Bend Independent School DistrictOct 3, 2025Bp022 - gym renovations & additions multiple campuses — additions to existing building — addition new gymnasium ; int. - replace carpeting & base in classr. re-paint corridors. re-stain stage steps; ext. - replace fabric and repaint struc. at hardtop, re-stripe. new playground, swings, canopy; ext. site improv. ; elp/mutip. renovations
- 2335 Dulles Ave · Fort Bend ISDSep 12, 2025Bp033 fine arts renovations at 16 campuses — renovation/alteration — alteration to art room to include a kiln room
- 3100 Lake Olympia Pkwy · Fort Bend ISDSep 12, 2025Bp033 fine arts renovations at 16 campuses — additions to existing building — renovate and reconfigure existing fine arts suite. construct fine arts building addition
- 10011 Steep Bank Trce · Fort Bend Independent School DistrictAug 14, 2025Sienna crossing elementary school renovation — renovation/alteration — replace cafeteria floor and add an operable partition between the cafeteria and multi-purpose room
- 7555 Highway 6 South · Sugar Creek Baptist ChurchJul 11, 2025Sugar creek baptist church - missouri city campus expansion — additions to existing building — addition of 21,000sf new worship space and interior renovation of 25,000sf existing building for sunday school education
- 3333 Hurricane Lane N/A · Fort Bend Independent School DidtrictApr 14, 2025Fbisd bp032 hightower high school additions and renovations — additions to existing building — this project encompasses several key areas like the auditorium and support spaces, black box theater, and storage. this renovation includes mechanical, audio visual, lighting, finishes upgrades and the construction of an addition including art and dr
- 1909 Waters Lake Blvd · Ronald Thornton Middle SchoolApr 14, 2025Ronald thornton middle school t-building relocation — additions to existing building — rolocate t-building from another fbisd campus
- 9000 Sienna Ranch Road · Fort Bend Independant School DistrictDec 20, 2024B039 hvac-mep east zone 1 baines middle school csp 24-070kb — renovation/alteration — major refurbishments of mep related scope (coolers, chillers, water heaters etc) no architectural, structural work. only mep
- 3323 Mission Valley Dr · Fort Bend Independent School DistrictOct 2, 2024Lantern lane es - bp043 mep renovations — renovation/alteration — hvac renovation/repair
- 3440 Independence Blvd · Fort Bend Independent School DistrictOct 1, 2024Armstrong es - bp043 mep renovations — renovation/alteration — hvac renovations to portions of existing campus
- 3019 FM 1092 · Fort Bend ISDJul 1, 2024Fort bend isd | quail valley middle school renovations — renovation/alteration — fort bend isd | quail valley middle school renovations
- 10011 Steep Bank Trace · Fort Bend ISDMay 15, 2024Sienna crossing es flooring renovations — renovation/alteration — floor replacement in classrooms and corridors
- 4208 Crow Valley Dr Missouri City, TX 77459 · Fbisd Design And Construction DepartmentApr 20, 2024Palmer es t-building relocation — additions to existing building — relocation of two existing classroom buildings to new site. work will connect to existing building by covered bridge with relocated stair
- 1909 Waters Lakes Blvd · Fbisd Design And Construction DepartmentApr 11, 2024Thornton middle school t-building renovation — additions to existing building — placement of two temporary classroom buildings with covered ramps, stairs and covered walkways
Questions
What schools & daycares are being built in Missouri City 77459?
2 addresses in 77459 have permits or project filings for schools & daycares in the last two years. The most recent was filed at 3019 FM 1092 Rd. Others include 7707 Highway 6, 5304 Sienna Pkwy, 7007 Knights Ct.
How can I find out when a new school is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new school permit is filed.