138b Fairmont Parkway 138b
Pasadena, TX 77504 · Fairpark Partners LLC
Oak Street Health suite build-out at Fairmont Junction
A 9,266-square-foot interior build-out for Oak Street Health is planned in an existing retail suite at Fairmont Junction in Pasadena. The TDLR project registration was filed August 2, 2024, and lists an applicant-estimated project cost of $1.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 2, 2024
- since Aug 2, 2024
- Largest scope
- 9,266 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Finishing up · inspection nextOak Street Health
9,266 sq ft · $1.5M est.
- RegisteredAug 2, 2024
- Plan review
- ConstructionSep '24 – Jan '25
- Inspectednow
- Closed
Scheduled to finish Jan 17, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior build-out of an existing (recently re-built) retail suite at a strip mall. — fairmont junction shopping center
TDLR project registrationRenovation/AlterationReview Complete9,266 sq ft$1.5M est.- Project #
- TABS2024024586
- Tenant / owner
- Oak Street Health
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 138b Fairmont Parkway 138b
What is being built at 138B Fairmont Parkway?
A 9,266-square-foot interior build-out for Oak Street Health in an existing retail suite at Fairmont Junction. TDLR registration TABS2024024586 describes it as a renovation or alteration.
When was the Oak Street Health project filed?
The TDLR registration was filed August 2, 2024. Its status is listed as Review Complete.
How much will the Fairmont Parkway project cost?
The applicant estimated the project cost at $1.5 million in the TDLR registration. This is an estimate, not a reported final project cost.
Is Oak Street Health building a new location in Pasadena?
The registration describes an interior build-out of an existing, recently rebuilt retail suite at Fairmont Junction, not new construction. It does not provide an opening date.
What's being built near HCA Houston Healthcare on Fairmont Parkway?
An interior build-out for Oak Street Health is registered at 138B Fairmont Parkway, about 35 meters from HCA Houston Healthcare at 150 Fairmont Parkway. The filing date was August 2, 2024.
Also being built nearby
All of 77504- 150 Fairmont Parkway · Hca Houston HealthcareSep 13, 2024Pasadena clinic — renovation/alteration — buildout into a clinic · 35 m away
- 154 Fairmont Parkway · Arc Aapsdtxoo1 LLCFeb 10, 2025Dollar tree — renovation/alteration — renovation of existing tenant retail space · 53 m away
- 135 Fairmont Parkway · Mcdonald's RestaurantAug 7, 2024Mcdonald's pasadena (42-3565) — new construction — new mcdonald's restaurant with new dual lane drive-thru layout located behind the restaurant and new site work as part of the scope of work · 64 m away
- 3820 Shaver St · Pasadena Independent School DistrictOct 31, 2025Pasadena isd - 2022 bond - cte culinary - south houston high school — renovation/alteration — 1535 sq ft pasadena isd - 2022 bond - cte culinary - south houston high school · 151 m away
- 3904 S Shaver StJun 15, 20211,785 sq ft change of use to medical office · 168 m away
- 3940 S Shaver St Bld12Jan 13, 2017Occ report/storage · 194 m away
- 3940 S Shaver St Bld14Jan 13, 2017Occ report/storage · 194 m away
- 3940 S Shaver St Bld13Jan 13, 2017Occ report/laundary/boiler room · 194 m away
- 3940 S Shaver St Bld11Sep 27, 2021Emergency habitability repairs sub bld 11 see master 19045280 · 241 m away
- 3940 S Shaver St Bld10Sep 27, 2021Emergency habitability repairs sub bld 10 see master 19045280 · 241 m away
- 3940 S Shaver StSep 27, 2021Emergency habitability repairs sub bld 3 see master 19045280 · 241 m away
- 3919 Freeton StOct 5, 2018Residential repair per spec list · 249 m away
More retail spaces in 77504.